Sunrise805

How many solar installs has Sunrise805 done in California, and which license number is on its installs?

Sunrise805 has 152 residential solar installs interconnected in California, active in the records from 2016 through 2026 (Mar 10, 2016 to Aug 11, 2026), most of them in Santa Barbara County (141), Ventura County (4) and Monterey County (3). CSLB lists license 1003200 (SUNRISE805) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Apr 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
152
Last 24 months
51
Total capacity
1,154.1 kW DC
Median system size
5.6 kW DC
With battery storage
45.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 82.4% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 152 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
33 installs, latest Aug 7, 2026
Ownership types recorded
none recorded
Median battery size
20 kWh (67 installs list a capacity)
First install
Mar 10, 2016
Latest install
Aug 11, 2026
Counties
6
Utilities
SCE 114, PGE 37, SDGE 1
CSLB license
1003200

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
201620
201750
201890
201930
2020220
2021124
2022135
20232112
2024198
20252823
2026 (through Aug 31, 2026)1816

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

33 of its 152 interconnected installs (21.7% of the 152 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 84.8% of those include battery storage. The latest Net Billing Tariff install was approved Aug 7, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.032.0%not counted
NEM 2.011676.3%40 (34.8%)
Net Billing Tariff3321.7%28 (84.8%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Sunrise805’s installs. No residential system in the file lists a third-party owner name that matches Sunrise805 exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 51 of Sunrise805’s 51 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (13, 25.5%) used modules recorded as JA Solar.

In the last 24 months, 51 of Sunrise805’s 51 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (37, 72.5%) used inverters recorded as Enphase.

In the last 24 months, 41 of Sunrise805’s 51 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (18, 43.9%) used batteries recorded as Enphase.

65 of 68 battery-paired PG&E and SCE installs (95.6%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerJA Solar1313
REC1118
Qcells926
Silfab4not in top list
Solaria428
Inverter makerEnphase37103
Tesla58
SolarEdge325
ABB22
FranklinWH2not in top list
Battery makerEnphase1825
FranklinWH1111
Tesla1127
Tsla Inc.11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 147 of 152 installs, inverters on 152. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Sunrise805 as developer on 3 battery storage projects and as installer on 1 (0 name it as both), 4 projects in all with 68 kWh of storage. 3 have the status Paid, with $30,787 in current incentive allocations. Applications were received from Jun 11, 2019 to Jul 26, 2023.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid357$30,787
Cancelled111$2,328

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage217$4,3872$4,387
Equity Resiliency140$26,4001$26,400
Large-Scale Storage111$2,3280$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1003200SUNRISE805 (Corporation)CLEARC-10 Electrical ContractorApr 27, 2015Apr 30, 2027152

License numbers are the ones the utilities recorded on the interconnection applications (152 of 152 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1003200. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Santa Barbara141
Ventura4
Monterey3
San Luis Obispo2
El Dorado1
San Diego1

Top cities

CityInstalls
Santa Barbara89
Buellton29
Carpinteria10
Goleta10
Marina3
Ventura3
San Luis Obispo2
El Dorado Hills1
Montecito1
Oxnard1
San Diego1
Santa Ynez1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SUNRISE805113
Sunrise80539

Common questions

Where does Sunrise805 install solar?

Its installs are spread across 6 counties. The most are in Santa Barbara County (141 installs), followed by Ventura County (4).

How often does Sunrise805 install batteries with solar?

45.0% of its interconnected solar installs include battery storage across all years, and 82.4% in the last 24 months (42 of 51). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Sunrise805 installs are under NEM 3.0 (the Net Billing Tariff)?

33 of its 152 interconnected installs (21.7% of the 152 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 84.8% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.