SANDOVAL MICHAEL LLC

How many solar installs has SANDOVAL MICHAEL LLC done in California, and which license number is on its installs?

SANDOVAL MICHAEL LLC has 89 residential solar installs interconnected in California, active in the records from 2021 through 2023 (Aug 18, 2021 to Mar 22, 2023), most of them in Fresno County (71), Madera County (6) and Tulare County (5). CSLB lists license 1076925 (SUPREME SOLAR & ELECTRIC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Jun 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
89
Last 24 months
0
Total capacity
774.5 kW DC
Median system size
8.1 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 89 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Aug 18, 2021
Latest install
Mar 22, 2023
Counties
5
Utilities
PGE 89
CSLB license
1076925

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
202160
2022630
2023200
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 89 interconnected installs with a tariff recorded (89) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.089100.0%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on SANDOVAL MICHAEL LLC’s installs. No residential system in the file lists a third-party owner name that matches SANDOVAL MICHAEL LLC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 88 of SANDOVAL MICHAEL LLC’s 89 installs name a module maker in the “Generator Manufacturer” fields, and most of those (58, 65.9%) used modules recorded as REC.

Across all years, 89 of SANDOVAL MICHAEL LLC’s 89 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (71, 79.8%) used inverters recorded as SolarEdge.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC058
Mission Solar011
Qcells09
SEG Solar05
Freevolt03
Inverter makerSolarEdge071
Enphase017
Magnetek01
SMA01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 88 of 89 installs, inverters on 89. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1076925SUPREME SOLAR & ELECTRIC (Limited Liability)CLEARC-10 Electrical Contractor; C-46 Solar ContractorJun 15, 2021Jun 30, 202789

License numbers are the ones the utilities recorded on the interconnection applications (89 of 89 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1076925. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list SANDOVAL MICHAEL LLC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2024Total
unincorporated San Diego County107692511

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Fresno71
Madera6
Tulare5
Kings4
San Joaquin3

Top cities

CityInstalls
Fresno41
Clovis26
Madera5
Lemoore4
Orosi3
Sanger3
Stockton3
Dinuba2
Coarsegold1
Selma1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SANDOVAL MICHAEL LLC89

Common questions

Where does SANDOVAL MICHAEL LLC install solar?

Its installs are spread across 5 counties. The most are in Fresno County (71 installs), followed by Madera County (6).

How often does SANDOVAL MICHAEL LLC install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many SANDOVAL MICHAEL LLC installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 89 interconnected installs with a tariff recorded (89) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.