Rightway Solar Electric

How many solar installs has Rightway Solar Electric done in California, and which license number is on its installs?

Rightway Solar Electric has 40 residential solar installs interconnected in California, active in the records from 2015 through 2023 (May 18, 2015 to Jun 27, 2023), most of them in Los Angeles County (26), Riverside County (7) and Orange County (3). CSLB lists license 995398 (RIGHT WAY SOLAR ELECTRIC INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Aug 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
40
Last 24 months
0
Total capacity
293.7 kW DC
Median system size
7.1 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 40 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
May 18, 2015
Latest install
Jun 27, 2023
Counties
5
Utilities
SCE 37, SDGE 3
CSLB license
995398

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
2015120
2016150
2017110
201800
201910
202000
202100
202200
202310
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 40 interconnected installs with a tariff recorded (40) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.03792.5%not counted
NEM 2.037.5%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Rightway Solar Electric’s installs. No residential system in the file lists a third-party owner name that matches Rightway Solar Electric exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 40 of Rightway Solar Electric’s 40 installs name a module maker in the “Generator Manufacturer” fields, and most of those (23, 57.5%) used modules recorded as Canadian Solar.

Across all years, 40 of Rightway Solar Electric’s 40 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (22, 55.0%) used inverters recorded as SolarEdge.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar023
SolarWorld08
Silfab03
Mitsubishi Electric02
Axitec01
Inverter makerSolarEdge022
SMA010
Enphase06
APsystems (Altenergy Power System)01
Fronius01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 40 of 40 installs, inverters on 40. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
995398RIGHT WAY SOLAR ELECTRIC INC (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorAug 5, 2014Aug 31, 202839

License numbers are the ones the utilities recorded on the interconnection applications (39 of 40 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 995398. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles26
Riverside7
Orange3
Kern2
San Diego2

Top cities

CityInstalls
Lancaster9
Palmdale6
California City2
Canyon Country2
Hemet2
Orange2
San Jacinto2
Agoura Hills1
Alpine1
Chatsworth1
Claremont1
Coto de Caza1
Lake Hughes1
Leona Valley1
Long Beach1

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Rightway Solar Electric34
Rightway Solar electric3
Rightway Solar Electric, Inc.2
RIGHTWAY SOLAR ELECTRIC INC.1

Common questions

Where does Rightway Solar Electric install solar?

Its installs are spread across 5 counties. The most are in Los Angeles County (26 installs), followed by Riverside County (7).

How often does Rightway Solar Electric install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Rightway Solar Electric installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 40 interconnected installs with a tariff recorded (40) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.