Renew Solar Construction

How many solar installs has Renew Solar Construction done in California, and which license number is on its installs?

Renew Solar Construction has 41 residential solar installs interconnected in California, active in the records from 2011 through 2020 (Apr 13, 2011 to Apr 20, 2020), most of them in Orange County (34), San Diego County (4) and Los Angeles County (3). The license number recorded on most of its installs, 557051, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
41
Last 24 months
0
Total capacity
389.8 kW DC
Median system size
8.5 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 38 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Apr 13, 2011
Latest install
Apr 20, 2020
Counties
3
Utilities
SCE 28, SDGE 13
CSLB license
557051

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2011 to 2026

YearInstalls interconnectedWith battery storage
201110
201200
201320
201410
201530
201680
201780
201880
201950
202050
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 41 interconnected installs with a tariff recorded (41) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.01843.9%not counted
NEM 2.02356.1%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Renew Solar Construction’s installs. No residential system in the file lists a third-party owner name that matches Renew Solar Construction exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 39 of Renew Solar Construction’s 41 installs name a module maker in the “Generator Manufacturer” fields, and most of those (38, 97.4%) used modules recorded as SunPower.

Across all years, 41 of Renew Solar Construction’s 41 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (24, 58.5%) used inverters recorded as SunPower.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower038
SolarWorld01
Inverter makerSunPower024
SMA013
Enphase03
Power-One01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 39 of 41 installs, inverters on 41. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
557051Not found in the CSLB License Master file pulled Nov 4, 202636

License numbers are the ones the utilities recorded on the interconnection applications (37 of 41 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Orange34
San Diego4
Los Angeles3

Top cities

CityInstalls
Corona del Mar5
Costa Mesa3
Dana Point3
Laguna Beach3
Mission Viejo3
Newport Coast3
Irvine2
Laguna Hills2
Long Beach2
Newport Beach2
Santa Ana2
Coto de Caza1
Encinitas1
Fullerton1
Huntington Beach1

Names as recorded by the utilities

The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Renew Solar Construction13
RENEW SOLAR CONSTRUCTION INC11
Renew Solar Construction, Inc.11
Renew Solar Construction Inc.4
RENEW SOLAR CONSTRUCTION1
Renew Solar Construction Inc1

Common questions

Where does Renew Solar Construction install solar?

Its installs are spread across 3 counties. The most are in Orange County (34 installs), followed by San Diego County (4).

How often does Renew Solar Construction install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Renew Solar Construction installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 41 interconnected installs with a tariff recorded (41) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.