PerryBuilt Construction, Inc. has 319 residential solar installs interconnected in California, active in the records from 2011 through 2026 (Oct 3, 2011 to Aug 10, 2026), most of them in Santa Clara County (162), Santa Cruz County (134) and Monterey County (14). CSLB lists license 988549 (PERRYBUILT CONSTRUCTION INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-46, expires Nov 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
319
Last 24 months
52
Total capacity
1,675.4 kW DC
Median system size
4.8 kW DC
With battery storage
9.1% all time; 44.2% last 24 months
Third-party owned
0.3% of 319 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
29 installs, latest Aug 10, 2026
Ownership types recorded
lease 1
Median battery size
2 kWh (15 installs list a capacity)
First install
Oct 3, 2011
Latest install
Aug 10, 2026
Counties
6
Utilities
PGE 319
CSLB license
988549

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2011 to 2026

YearInstalls interconnectedWith battery storage
201120
201230
201310
201470
2015550
2016340
2017190
2018221
2019200
2020240
2021230
2022121
2023323
2024192
20253514
2026 (through Aug 31, 2026)118

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

29 of its 319 interconnected installs (9.1% of the 319 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 72.4% of those include battery storage. The latest Net Billing Tariff install was approved Aug 10, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.010432.6%not counted
NEM 2.018658.3%7 (3.8%)
Net Billing Tariff299.1%21 (72.4%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of PerryBuilt Construction, Inc.’s installs the utility recorded a third-party ownership type: PPA 0, lease 1, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches PerryBuilt Construction, Inc. exactly.

Third-party owner named on its installsInstalls
SunPower Corporation1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 49 of PerryBuilt Construction, Inc.’s 52 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (17, 34.7%) used modules recorded as Qcells.

In the last 24 months, 52 of PerryBuilt Construction, Inc.’s 52 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (39, 75.0%) used inverters recorded as Enphase.

In the last 24 months, 17 of PerryBuilt Construction, Inc.’s 52 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (12, 70.6%) used batteries recorded as Tesla.

20 of 29 battery-paired PG&E and SCE installs (69.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells1742
REC1621
Panasonic721
Hyundai3not in top list
SunPower3132
Inverter makerEnphase39123
Tesla1920
SunPower358
APsystems (Altenergy Power System)1not in top list
FranklinWH1not in top list
Battery makerTesla1212
Enphase35
FranklinWH11
PointGuard Energy Inc.11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 307 of 319 installs, inverters on 319. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names PerryBuilt Construction, Inc. as developer on 2 battery storage projects and as installer on 2 (2 name it as both), 2 projects in all with 28 kWh of storage. 2 have the status Paid, with $21,930 in current incentive allocations. Applications were received from Dec 4, 2018 to Feb 27, 2022.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid228$21,930

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency119$19,4121$19,412
Small Residential Storage18$2,5181$2,518

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
988549PERRYBUILT CONSTRUCTION INC (Corporation)CLEARB General Building Contractor; C-46 Solar ContractorNov 19, 2013Nov 30, 2027304

License numbers are the ones the utilities recorded on the interconnection applications (311 of 319 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 988549. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Santa Clara162
Santa Cruz134
Monterey14
San Mateo6
San Benito2
Contra Costa1

Top cities

CityInstalls
San Jose86
Scotts Valley51
Santa Cruz37
Los Gatos17
Soquel15
Aptos14
Los Altos13
Saratoga11
Cupertino6
Mountain View6
Sunnyvale6
Watsonville6
Campbell5
Felton5
Gilroy5

Names as recorded by the utilities

The utilities recorded this installer under 13 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
PERRYBUILT CONSTRUCTION INC150
PerryBuilt Construction, Inc.133
PerryBuilt Construction Inc12
Perrybuilt Construction6
PerryBuilt Construction Inc.4
PerryBuilt Construction, Inc3
Perrybuilt Construction Inc2
Perrybuilt Construction, Inc2
Perrybuilt Construction, Inc.2
PerryBuilt Construction, inc.2
PerryBuilt Construction1
Perrybuilt Construction, INC1
PerryBuilt Construction, INC1

Common questions

Where does PerryBuilt Construction, Inc. install solar?

Its installs are spread across 6 counties. The most are in Santa Clara County (162 installs), followed by Santa Cruz County (134).

How often does PerryBuilt Construction, Inc. install batteries with solar?

9.1% of its interconnected solar installs include battery storage across all years, and 44.2% in the last 24 months (23 of 52).

How many PerryBuilt Construction, Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

29 of its 319 interconnected installs (9.1% of the 319 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 72.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.