OCAL has 64 residential solar installs interconnected in California, active in the records from 2020 through 2026 (Jan 2, 2020 to Apr 23, 2026), most of them in Sonoma County (55), Marin County (5) and Lake County (2). CSLB lists license 981865 (OCAL) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-39, C-46, expires Sep 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
64
Last 24 months
14
Total capacity
438 kW DC
Median system size
6.1 kW DC
With battery storage
37.5% all time; 50.0% last 24 months
Third-party owned
0.0% of 64 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
7 installs, latest Mar 15, 2026
Ownership types recorded
none recorded
Median battery size
16 kWh (19 installs list a capacity)
First install
Jan 2, 2020
Latest install
Apr 23, 2026
Counties
5
Utilities
PGE 64
CSLB license
981865

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2020 to 2026

YearInstalls interconnectedWith battery storage
202091
2021112
2022136
2023147
202474
202542
2026 (through Aug 31, 2026)62

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

7 of its 64 interconnected installs (10.9% of the 64 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 85.7% of those include battery storage. The latest Net Billing Tariff install was approved Mar 15, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.023.1%not counted
NEM 2.05585.9%17 (30.9%)
Net Billing Tariff710.9%6 (85.7%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on OCAL’s installs. No residential system in the file lists a third-party owner name that matches OCAL exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 14 of OCAL’s 14 installs name a module maker in the “Generator Manufacturer” fields, and most of those (10, 71.4%) used modules recorded as Silfab.

In the last 24 months, 14 of OCAL’s 14 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (13, 92.9%) used inverters recorded as SolarEdge.

In the last 24 months, 7 of OCAL’s 14 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (5, 71.4%) used batteries recorded as FranklinWH.

23 of 24 battery-paired PG&E and SCE installs (95.8%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSilfab1056
United Renewable Energy34
JA Solar11
Inverter makerSolarEdge1363
FranklinWH55
Enphase13
Battery makerFranklinWH55
LG218

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 62 of 64 installs, inverters on 64. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
981865OCAL (Corporation)CLEAR, Pending Case/CIT| DISC Bond FiledB General Building Contractor; C-10 Electrical Contractor; C-39 Roofing Contractor; C-46 Solar ContractorMar 9, 2013Sep 30, 202864

License numbers are the ones the utilities recorded on the interconnection applications (64 of 64 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

CSLB’s License Master file lists a disciplinary bond on license 981865 (bond reason recorded: Conditional), required Dec 2, 2025, $30,000, CSLB case number 2024000135, no cancellation date recorded. CSLB lists license 981865 under the business name OCAL; the bond is on the license, as CSLB records it. Current CSLB record: 981865.

What a disciplinary bond is: CSLB’s Bond Basics page says that when a license has been revoked, or in some instances suspended, for a violation of the Contractors State License Law, the contractor must file a disciplinary bond with the Registrar to reinstate, reissue or reapply for a license, and that the bond must stay on file for at least two years (CSLB Bond Basics). The file gives one disciplinary bond entry per license and does not say which of those circumstances applied, what the case was about or how it ended. CSLB’s license detail page shows any public disciplinary action.

Local solar permits naming its license

Solar permits in city and county open data that list OCAL’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2018Total
unincorporated Marin County98186522

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Sonoma55
Marin5
Lake2
Contra Costa1
Solano1

Top cities

CityInstalls
Santa Rosa32
Sebastopol8
Petaluma4
Rohnert Park4
Forestville2
Bodega1
Bodega Bay1
Cazadero1
Clearlake1
Kenwood1
Lower Lake1
Mill Valley1
Novato1
Olema1
Richmond1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
OCAL64

Common questions

Where does OCAL install solar?

Its installs are spread across 5 counties. The most are in Sonoma County (55 installs), followed by Marin County (5).

How often does OCAL install batteries with solar?

37.5% of its interconnected solar installs include battery storage across all years, and 50.0% in the last 24 months (7 of 14).

How many OCAL installs are under NEM 3.0 (the Net Billing Tariff)?

7 of its 64 interconnected installs (10.9% of the 64 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 85.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources