NEXGEN

How many solar installs has NEXGEN done in California, and which license number is on its installs?

NEXGEN has 105 residential solar installs interconnected in California, active in the records from 2009 through 2017 (Oct 16, 2009 to Dec 4, 2017), most of them in Orange County (56), Los Angeles County (41) and Riverside County (3). The utilities did not record a CSLB license number on enough of these installs to look one up.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
105
Last 24 months
0
Total capacity
512.4 kW DC
Median system size
4.6 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 65 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Oct 16, 2009
Latest install
Dec 4, 2017
Counties
6
Utilities
SCE 105
CSLB license
none reported

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2009 to 2026

YearInstalls interconnectedWith battery storage
200940
201060
2011110
2012130
2013320
2014270
2015110
201600
201710
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 105 interconnected installs with a tariff recorded (105) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.010499.0%not counted
NEM 2.011.0%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on NEXGEN’s installs. No residential system in the file lists a third-party owner name that matches NEXGEN exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 1 of NEXGEN’s 105 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used modules recorded as Silfab.

Across all years, 105 of NEXGEN’s 105 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (75, 71.4%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSilfab01
Inverter makerEnphase075
Siemens Industry021
SMA05
Fronius04

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 1 of 105 installs, inverters on 105. See the methodology and the equipment index.

Contractor license

The utilities did not record a license number for enough of these installs to look one up.

License numbers are the ones the utilities recorded on the interconnection applications (1 of 105 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it.

Counties

CountyInstalls
Orange56
Los Angeles41
Riverside3
Tulare3
Kern1
San Bernardino1

Top cities

CityInstalls
Long Beach25
Los Alamitos19
Huntington Beach7
Costa Mesa4
Seal Beach4
Fullerton3
Garden Grove3
Cerritos2
Cypress2
Lakewood2
Santa Ana2
Villa Park2
Visalia2
West Covina2
Westminster2

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
NEXGEN104
Nexgen1

Common questions

Where does NEXGEN install solar?

Its installs are spread across 6 counties. The most are in Orange County (56 installs), followed by Los Angeles County (41).

How often does NEXGEN install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many NEXGEN installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 105 interconnected installs with a tariff recorded (105) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.