M ENERGY INC

How many solar installs has M ENERGY INC done in California, and which license number is on its installs?

M ENERGY INC has 101 residential solar installs interconnected in California, active in the records from 2017 through 2026 (Jul 18, 2017 to Jun 8, 2026), most of them in San Bernardino County (54), Riverside County (34) and Los Angeles County (9). CSLB lists license 1008321 (M ENERGY INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Jun 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
101
Last 24 months
12
Total capacity
865.7 kW DC
Median system size
7.9 kW DC
With battery storage
11.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 33.3% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 101 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
20 installs, latest Jun 8, 2026
Ownership types recorded
none recorded
Median battery size
10 kWh (11 installs list a capacity)
First install
Jul 18, 2017
Latest install
Jun 8, 2026
Counties
4
Utilities
SCE 100, SDGE 1
CSLB license
1008321

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2017 to 2026

YearInstalls interconnectedWith battery storage
201720
2018120
201980
2020111
2021112
2022221
2023160
2024125
202551
2026 (through Aug 31, 2026)21

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

20 of its 101 interconnected installs (19.8% of the 101 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 35.0% of those include battery storage. The latest Net Billing Tariff install was approved Jun 8, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.08180.2%4 (5.0%)
Net Billing Tariff2019.8%7 (35.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on M ENERGY INC’s installs. No residential system in the file lists a third-party owner name that matches M ENERGY INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 12 of M ENERGY INC’s 12 installs name a module maker in the “Generator Manufacturer” fields, and most of those (10, 83.3%) used modules recorded as Qcells.

In the last 24 months, 12 of M ENERGY INC’s 12 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (12, 100.0%) used inverters recorded as SolarEdge.

In the last 24 months, 4 of M ENERGY INC’s 12 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (2, 50.0%) used batteries recorded as LG.

11 of 11 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells1062
(21) LG300N1K-G4, (3) SUN POWER SPR-E20-330-COM11
LONGi1not in top list
Inverter makerSolarEdge1269
Battery makerLG27
SolarEdge24

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 97 of 101 installs, inverters on 101. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1008321M ENERGY INC (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorOct 20, 2015Jun 30, 2028101

License numbers are the ones the utilities recorded on the interconnection applications (101 of 101 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1008321. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
San Bernardino54
Riverside34
Los Angeles9
Orange4

Top cities

CityInstalls
Fontana14
San Bernardino13
Jurupa Valley11
Rialto8
Moreno Valley6
Riverside4
Nuevo3
Perris3
Apple Valley2
Castaic2
Corona2
Hemet2
Hesperia2
Inglewood2
Ontario2

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
M ENERGY INC95
M ENERGY6

Common questions

Where does M ENERGY INC install solar?

Its installs are spread across 4 counties. The most are in San Bernardino County (54 installs), followed by Riverside County (34).

How often does M ENERGY INC install batteries with solar?

11.0% of its interconnected solar installs include battery storage across all years, and 33.3% in the last 24 months (4 of 12). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many M ENERGY INC installs are under NEM 3.0 (the Net Billing Tariff)?

20 of its 101 interconnected installs (19.8% of the 101 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 35.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.