joe moore const inc

How many solar installs has joe moore const inc done in California, and which license number is on its installs?

joe moore const inc has 48 residential solar installs interconnected in California, active in the records from 2016 through 2024 (Aug 16, 2016 to Apr 25, 2024), most of them in San Diego County (46) and Orange County (2). CSLB lists license 387345 (JOE MOORE CONSTRUCTION INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Feb 28, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
48
Last 24 months
0
Total capacity
312 kW DC
Median system size
5.5 kW DC
With battery storage
not recorded (SDG&E files batteries as separate projects, not on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 48 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
1 installs, latest Apr 25, 2024
Ownership types recorded
none recorded
First install
Aug 16, 2016
Latest install
Apr 25, 2024
Counties
2
Utilities
SDGE 48
CSLB license
387345

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
2016110
201780
201840
2019100
202020
202140
202250
202330
202410
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

1 of its 48 interconnected installs (2.1% of the 48 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Apr 25, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.04797.9%not recorded
Net Billing Tariff12.1%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on joe moore const inc’s installs. No residential system in the file lists a third-party owner name that matches joe moore const inc exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 45 of joe moore const inc’s 48 installs name a module maker in the “Generator Manufacturer” fields, and most of those (37, 82.2%) used modules recorded as LG.

Across all years, 48 of joe moore const inc’s 48 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (48, 100.0%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLG037
Qcells08
Inverter makerEnphase048
SMA02
OutBack Power01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 45 of 48 installs, inverters on 48. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names joe moore const inc as developer on 3 battery storage projects and as installer on 2 (2 name it as both), 3 projects in all with 23 kWh of storage. 2 have the status Paid, with $2,700 in current incentive allocations. Applications were received from May 1, 2017 to Jul 7, 2017.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid213$2,700
Cancelled110$4,000

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage323$6,7002$2,700

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
387345JOE MOORE CONSTRUCTION INC (Corporation)CLEARB General Building ContractorFeb 27, 1980Feb 28, 202747

License numbers are the ones the utilities recorded on the interconnection applications (48 of 48 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 387345. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list joe moore const inc’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020Total
unincorporated San Diego County3873451315

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Diego46
Orange2

Top cities

CityInstalls
Carlsbad12
San Diego4
Coronado3
Oceanside3
Rancho Santa Fe3
Santee3
Solana Beach3
Alpine2
Escondido2
Fallbrook2
Laguna Hills2
Rancho la Costa2
Vista2
Boulevard1
Dana Point1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
joe moore const inc48

Common questions

Where does joe moore const inc install solar?

Its installs are spread across 2 counties. The most are in San Diego County (46 installs), followed by Orange County (2).

How often does joe moore const inc install batteries with solar?

Battery storage is not recorded on its interconnected solar installs: SDG&E files a battery as its own project record, not on the solar record.

How many joe moore const inc installs are under NEM 3.0 (the Net Billing Tariff)?

1 of its 48 interconnected installs (2.1% of the 48 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.