JDC ENERGY has 38 residential solar installs interconnected in California, active in the records from 2014 through 2021 (Feb 25, 2014 to Jun 23, 2021), most of them in Riverside County (13), San Bernardino County (13) and Los Angeles County (10). CSLB lists license 1025569 (JDC ENERGY) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Apr 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
38
Last 24 months
0
Total capacity
214.2 kW DC
Median system size
4.7 kW DC
With battery storage
2.6% all time; no installs in the last 24 months last 24 months
Third-party owned
6.7% of 15 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 1
Median battery size
10.1 kWh (1 installs list a capacity)
First install
Feb 25, 2014
Latest install
Jun 23, 2021
Counties
4
Utilities
SCE 38
CSLB license
1025569

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
2014170
201580
201600
201720
201800
2019100
202000
202111
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 38 interconnected installs with a tariff recorded (38) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.02565.8%not counted
NEM 2.01334.2%1 (7.7%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of JDC ENERGY’s installs the utility recorded a third-party ownership type: PPA 1, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches JDC ENERGY exactly.

Third-party owner named on its installsInstalls
Sunrun1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 13 of JDC ENERGY’s 38 installs name a module maker in the “Generator Manufacturer” fields, and most of those (10, 76.9%) used modules recorded as Qcells.

Across all years, 38 of JDC ENERGY’s 38 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (18, 47.4%) used inverters recorded as SMA.

Across all years, 1 of JDC ENERGY’s 38 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as Enphase.

1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells010
Hyundai01
LG01
Silfab01
Inverter makerSMA018
SolarEdge016
Enphase04
Battery makerEnphase01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 13 of 38 installs, inverters on 38. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1025569JDC ENERGY (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorApr 7, 2017Apr 30, 202711

License numbers are the ones the utilities recorded on the interconnection applications (13 of 38 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1025569. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Riverside13
San Bernardino13
Los Angeles10
Orange2

Top cities

CityInstalls
Corona3
Ontario3
Riverside3
Pomona2
Rancho Cucamonga2
Victorville2
Alta Loma1
Arcadia1
Baldwin Park1
Beaumont1
Chino Hills1
Claremont1
Desert Hot Springs1
Fontana1
Hesperia1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
JDC ENERGY35
JDC Energy3

Common questions

Where does JDC ENERGY install solar?

Its installs are spread across 4 counties. The most are in Riverside County (13 installs), followed by San Bernardino County (13).

How often does JDC ENERGY install batteries with solar?

2.6% of its interconnected solar installs include battery storage across all years.

How many JDC ENERGY installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 38 interconnected installs with a tariff recorded (38) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.