HOT PURPLE INC

How many solar installs has HOT PURPLE INC done in California, and which license number is on its installs?

HOT PURPLE INC has 248 residential solar installs interconnected in California, active in the records from 2019 through 2023 (Sep 19, 2019 to Sep 6, 2023), most of them in Riverside County (232) and San Bernardino County (16). CSLB lists license 940550 (HOT PURPLE ENERGY) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-46, expires Dec 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
248
Last 24 months
0
Total capacity
2,203.5 kW DC
Median system size
8 kW DC
With battery storage
65.3% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 248 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
Median battery size
13.5 kWh (162 installs list a capacity)
First install
Sep 19, 2019
Latest install
Sep 6, 2023
Counties
2
Utilities
SCE 248
CSLB license
940550

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
20193726
2020192125
2021168
202200
202333
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 248 interconnected installs with a tariff recorded (248) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0176.9%not counted
NEM 2.023193.1%147 (63.6%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on HOT PURPLE INC’s installs. No residential system in the file lists a third-party owner name that matches HOT PURPLE INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 248 of HOT PURPLE INC’s 248 installs name a module maker in the “Generator Manufacturer” fields, and most of those (168, 67.7%) used modules recorded as Panasonic.

Across all years, 248 of HOT PURPLE INC’s 248 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (183, 73.8%) used inverters recorded as SolarEdge.

Across all years, 162 of HOT PURPLE INC’s 248 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (137, 84.6%) used batteries recorded as Tesla.

162 of 162 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerPanasonic0168
REC043
SunPower028
LG02
Qcells02
Inverter makerSolarEdge0183
Enphase034
SunPower019
SMA07
Power-One03
Battery makerTesla0137
LG023
SolarEdge02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 248 of 248 installs, inverters on 248. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
940550HOT PURPLE ENERGY (Corporation)CLEARB General Building Contractor; C-46 Solar ContractorDec 1, 2009Dec 31, 2027248

License numbers are the ones the utilities recorded on the interconnection applications (248 of 248 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 940550. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Riverside232
San Bernardino16

Top cities

CityInstalls
Palm Springs128
Rancho Mirage31
Palm Desert26
Indian Wells23
Cathedral City16
Joshua Tree6
Desert Hot Springs5
Yucca Valley5
Idyllwild2
Morongo Valley2
Pioneertown2
Twentynine Palms1
Whitewater1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
HOT PURPLE INC248

Common questions

Where does HOT PURPLE INC install solar?

Its installs are spread across 2 counties. The most are in Riverside County (232 installs), followed by San Bernardino County (16).

How often does HOT PURPLE INC install batteries with solar?

65.3% of its interconnected solar installs include battery storage across all years.

How many HOT PURPLE INC installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 248 interconnected installs with a tariff recorded (248) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.