GREENWIRED INC

How many solar installs has GREENWIRED INC done in California, and which license number is on its installs?

GREENWIRED INC has 427 residential solar installs interconnected in California, active in the records from 2010 through 2026 (Jan 7, 2010 to Aug 27, 2026), most of them in Humboldt County (419), Mendocino County (4) and Trinity County (4). CSLB lists license 954140 (GREENWIRED INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-20, C-46, expires Nov 30, 2026.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
427
Last 24 months
110
Total capacity
2,915.4 kW DC
Median system size
6.2 kW DC
With battery storage
28.6% all time; 75.5% last 24 months
Third-party owned
0.2% of 427 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
97 installs, latest Aug 27, 2026
Ownership types recorded
other 1
Median battery size
14.3 kWh (72 installs list a capacity)
First install
Jan 7, 2010
Latest install
Aug 27, 2026
Counties
3
Utilities
PGE 427
CSLB license
954140

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
201020
201100
201210
201360
201430
201580
201660
201760
2018100
2019110
2020185
2021304
2022656
20239213
20248027
20254935
2026 (through Aug 31, 2026)4032

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

97 of its 427 interconnected installs (22.7% of the 427 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 91.8% of those include battery storage. The latest Net Billing Tariff install was approved Aug 27, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0276.3%not counted
NEM 2.030371.0%33 (10.9%)
Net Billing Tariff9722.7%89 (91.8%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of GREENWIRED INC’s installs the utility recorded a third-party ownership type: PPA 0, lease 0, prepaid lease 0, other 1. Across all installers, 1 residential systems list a third-party owner name that matches GREENWIRED INC exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
greenwired1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 106 of GREENWIRED INC’s 110 installs name a module maker in the “Generator Manufacturer” fields, and most of those (88, 83.0%) used modules recorded as REC.

In the last 24 months, 110 of GREENWIRED INC’s 110 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (34, 30.9%) used inverters recorded as Tesla.

In the last 24 months, 52 of GREENWIRED INC’s 110 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (29, 55.8%) used batteries recorded as Tesla.

87 of 122 battery-paired PG&E and SCE installs (71.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC88373
MidNite Solar Inc.1616
Mission Solar88
JA Solar55
EG44not in top list
Inverter makerTesla3437
Enphase25261
Sol-Ark1822
PointGuard Energy Inc.13not in top list
Sigenergy9not in top list
Battery makerTesla2931
PointGuard Energy Inc.1111
Sigenergy88
FranklinWH3not in top list
Enphase125

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 412 of 427 installs, inverters on 427. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names GREENWIRED INC as developer on 45 battery storage projects and as installer on 44 (44 name it as both), 45 projects in all with 761 kWh of storage. 26 have the status Paid, with $382,174 in current incentive allocations. Applications were received from Dec 6, 2022 to Dec 30, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid26495$382,174
Reserved226$47,576
Cancelled17240$116,292

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency17367$329,18115$305,481
Large-Scale Storage12172$42,9001$3,300
Small Residential Storage9117$16,9348$15,164
Residential Solar and Storage Equity - AB 209 Non-POU692$146,8642$58,230
Residential Solar and Storage Equity - Ratepayer113$10,1640$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
954140GREENWIRED INC (Corporation)CLEAR, Renewal RecivedC-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-46 Solar ContractorNov 2, 2010Nov 30, 2026417

License numbers are the ones the utilities recorded on the interconnection applications (418 of 427 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 954140. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Humboldt419
Mendocino4
Trinity4

Top cities

CityInstalls
Eureka128
Mckinleyville79
Arcata68
Fortuna33
Bayside18
Redway13
Garberville9
Trinidad8
Ferndale7
Miranda7
Hydesville6
Kneeland6
Loleta6
Fieldbrook5
Whitethorn5

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
GREENWIRED INC377
Greenwired27
greenwired19
GREENWIRED4

Common questions

Where does GREENWIRED INC install solar?

Its installs are spread across 3 counties. The most are in Humboldt County (419 installs), followed by Mendocino County (4).

How often does GREENWIRED INC install batteries with solar?

28.6% of its interconnected solar installs include battery storage across all years, and 75.5% in the last 24 months (83 of 110).

How many GREENWIRED INC installs are under NEM 3.0 (the Net Billing Tariff)?

97 of its 427 interconnected installs (22.7% of the 427 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 91.8% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.