Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Trinity County are ELECTRICIAN INCORPORATED THE (1), Hufft Solar inc (1) and ORIGIN SOLAR USA INC (1). They account for 3 of the 5 residential solar installs interconnected there in that window.

In all, 39 homes in Trinity County have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installers ranked by interconnected installs, last 24 months

Sep 2024 through Aug 2026. Top 3 of 3 installers with installs in this window. 2 installs in the window were self-installed or had no installer recorded.

1ELECTRICIAN INCORPORATED THE11
2Hufft Solar inc11
3ORIGIN SOLAR USA INC11

Most installs, all time

1Westhaven Inc66
2GREENWIRED INC44
3Solar Projects Unlimited44
4Addy Electric Inc.22
5FREEDOM FOREVER LLC22
6Townsend Construction22
7ABUNDANCE BUILDERS11
8ADDY SOLAR11
9ELECTRICIAN INCORPORATED THE11
10Hufft Solar inc11

Installs by year

YearInstalls interconnectedWith battery storage
202221
202332
202431
202532
2026 (through Aug 31, 2026)11

Under the Net Billing Tariff (NEM 3.0)

3 of the 39 residential solar installs in Trinity County (7.7% of the 39 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The latest was approved May 11, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Installers ranked by Net Billing Tariff installs in Trinity County

1ELECTRICIAN INCORPORATED THE11100.0%
2Hufft Solar inc11100.0%
3ORIGIN SOLAR USA INC11100.0%

Top 3, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.

Cities in Trinity County

CityAll-time installs
Burnt Ranch19
Salyer14
Mad River2
Garberville1
Hawkins Bar1
Ruth1
Zenia1

Equipment recorded

In the last 24 months, 5 of Trinity County’s 5 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (2, 40.0%) used modules recorded as REC.

In the last 24 months, 5 of Trinity County’s 5 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (3, 60.0%) used inverters recorded as Enphase.

In the last 24 months, 2 of Trinity County’s 5 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (2, 100.0%) used batteries recorded as Enphase.

6 of 7 battery-paired PG&E and SCE installs (85.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC29
Briggs & Stratton, LLC11
JA Solar1not in top list
Trina Solar1not in top list
VSUN (Vietnam Sunergy)1not in top list
Inverter makerEnphase38
Sol-Ark12
SolarEdge18
Battery makerEnphase24

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 37 of 39 installs, inverters on 39. See the methodology and the equipment index.

SGIP battery storage projects in Trinity County

The SGIP public project report downloaded Nov 16, 2026 lists 5 battery storage projects in Trinity County with the status Paid, carrying $31,091 in current incentive allocations and 82 kWh of storage. Across every status it lists 10 storage projects there, 3 of them cancelled and 2 at another stage.

Status as publishedProjectsStorage kWhCurrent incentive
Paid582$31,091
Reserved228$94,294
Cancelled367$40,592

Installers named on the most SGIP storage projects in Trinity County

InstallerProjectsPaid
GREENWIRED INC22
HAVEN-ELECTRIC INC20
Westhaven Solar22
FREEDOM FOREVER LLC11
HAVEN ENERGY SERVICES INC10

2 of the 10 projects name no installer with a page in this index, so they are counted above but not in this list.

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

All SGIP battery projects, and SGIP battery incentive money by county.

Electric utilities serving Trinity County (EIA)

EIA’s 2025 Service Territory file lists 3 utilities serving Trinity County. 1 filed net metering rows; their counts below cover each utility’s whole California service area, not only this county.

Utility (EIA name)Ownership (EIA)PV installationsResidentialPV capacity MWUnitPV-paired batteries
Pacific Gas & Electric Co.Investor Owned949,590924,8549,449.31AC178,468

Also listed for this county, with no utility-level net metering row in the 2025 file: Trinity Public Utilities Dist; WAPA-- Western Area Power Administration. For short form filers, EIA’s net metering file note says its state adjustments “include PV capacity from the short form.”

From EIA’s Form EIA-861 2025 data files (downloaded Nov 16, 2026). EIA describes the net metering file this way: “The data contain cumulative installation count and capacity of generators that are net metered by technology, state, sector, and balancing authority.” Counts are utility-reported as of December 31, 2025, for each utility’s whole California service area. Unit is the capacity unit the utility reported, AC or DC; EIA’s utility rows are “reported as collected,” so DC and AC figures are not converted here. Blank cells are cells EIA printed as a period. EIA’s file notes: “All Technologies does not include batteries.”

All California utilities in EIA’s net metering data.

Solar contractor licenses in Trinity County

1 C-46 Solar license in the CSLB License Master file downloaded Nov 4, 2026 (latest LastUpdate date in the file: Nov 4, 2026) lists Trinity County as the county: 0 with the business type Corporation, Limited Liability, Partnership or JointVenture and 1 Sole Owner. 1 C-10 Electrical license in Trinity County carries a license number the utilities recorded on 10 or more residential solar records.

Solar contractor licenses in Trinity County, with status, bond and workers’ compensation fields as CSLB publishes them. Sole Owner licenses are counted but not named.

At a glance

Residential solar installs
39
Last 24 months
5
Capacity
248.2 kW DC
Median system size
4.7 kW DC
With battery storage
17.9% all time; 60.0% last 24 months
Third-party owned
2.6% where reported
Ownership types recorded
PPA 1
Median battery size
19.5 kWh
Earliest install in data
Feb 26, 2002

Common questions

How many homes in Trinity County have solar?

39 residential solar systems in Trinity County were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 5 of them in the last 24 months. Homes on municipal utilities are not included.

How many solar installers work in Trinity County?

3 installer names have at least one install interconnected in Trinity County in the last 24 months, and 20 appear in the full record.

How common are batteries with new solar in Trinity County?

17.9% of the solar installs interconnected in Trinity County include battery storage across all years, and 60.0% in the last 24 months (3 of 5).

How many solar installs in Trinity County are under NEM 3.0?

3 of the 39 residential solar installs in Trinity County (7.7% of the 39 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.