Free Energy Construction

How many solar installs has Free Energy Construction done in California, and which license number is on its installs?

Free Energy Construction has 40 residential solar installs interconnected in California, active in the records from 2011 through 2018 (Oct 24, 2011 to Jun 27, 2018), most of them in San Bernardino County (18), Los Angeles County (15) and Orange County (6). The license number recorded on most of its installs, 975411, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
40
Last 24 months
0
Total capacity
204.4 kW DC
Median system size
4.9 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
5.0% of 40 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
lease 2
First install
Oct 24, 2011
Latest install
Jun 27, 2018
Counties
4
Utilities
SCE 40
CSLB license
975411

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2011 to 2026

YearInstalls interconnectedWith battery storage
201110
201270
201300
201400
2015100
201680
201760
201880
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 40 interconnected installs with a tariff recorded (40) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.02972.5%not counted
NEM 2.01127.5%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 2 of Free Energy Construction’s installs the utility recorded a third-party ownership type: PPA 0, lease 2, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Free Energy Construction exactly.

Third-party owner named on its installsInstalls
Choi, Richard2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 31 of Free Energy Construction’s 40 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (14, 45.2%) used modules recorded as Renesola America.

Across all years, 40 of Free Energy Construction’s 40 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (21, 52.5%) used inverters recorded as Fronius.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerRenesola America014
Qcells012
Canadian Solar02
LG01
Renogy01
Inverter makerFronius021
Renesola Zhejiang08
Renesola America03
SMA03
Enphase02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 31 of 40 installs, inverters on 40. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Free Energy Construction as developer on 0 battery storage projects and as installer on 1 (0 name it as both), 1 projects in all with 60 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from May 7, 2012 to May 7, 2012.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled160$59,920

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Not stated160$59,9200$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
975411Not found in the CSLB License Master file pulled Nov 4, 202627

License numbers are the ones the utilities recorded on the interconnection applications (37 of 40 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
San Bernardino18
Los Angeles15
Orange6
Riverside1

Top cities

CityInstalls
Phelan7
Fullerton4
San Bernardino3
Cerritos2
Littlerock2
Newhall2
Apple Valley1
Arcadia1
Chino Hills1
Fontana1
Garden Grove1
Hacienda Heights1
Helendale1
Hesperia1
La Crescenta1

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Free Energy Construction21
FREE ENERGY CONSTRUCTION INC10
Free Energy Construction Inc.8
free energy construction.inc1

Common questions

Where does Free Energy Construction install solar?

Its installs are spread across 4 counties. The most are in San Bernardino County (18 installs), followed by Los Angeles County (15).

How often does Free Energy Construction install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Free Energy Construction installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 40 interconnected installs with a tariff recorded (40) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.