Foothill Electric, Inc

How many solar installs has Foothill Electric, Inc done in California, and which license number is on its installs?

Foothill Electric, Inc has 66 residential solar installs interconnected in California, active in the records from 2006 through 2025 (Mar 22, 2006 to Aug 8, 2025), most of them in Placer County (50), Nevada County (10) and El Dorado County (3). CSLB lists license 494891 (FOOTHILL ELECTRIC INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Aug 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
66
Last 24 months
2
Total capacity
505.8 kW DC
Median system size
6.9 kW DC
With battery storage
4.5% all time; 50.0% last 24 months
Third-party owned
0.0% of 66 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
1 installs, latest Oct 1, 2024
Ownership types recorded
none recorded
First install
Mar 22, 2006
Latest install
Aug 8, 2025
Counties
5
Utilities
PGE 66
CSLB license
494891

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2006 to 2026

YearInstalls interconnectedWith battery storage
200610
200710
200800
200940
201050
201110
201230
201330
201410
201500
201640
2017100
201840
2019130
202060
202130
202200
202352
202411
202510
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

1 of its 66 interconnected installs (1.5% of the 66 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The latest Net Billing Tariff install was approved Oct 1, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.02436.4%not counted
NEM 2.04162.1%2 (4.9%)
Net Billing Tariff11.5%1 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Foothill Electric, Inc’s installs. No residential system in the file lists a third-party owner name that matches Foothill Electric, Inc exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 2 of Foothill Electric, Inc’s 2 installs name a module maker in the “Generator Manufacturer” fields, and most of those (2, 100.0%) used modules recorded as United Renewable Energy.

In the last 24 months, 2 of Foothill Electric, Inc’s 2 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (2, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 1 of Foothill Electric, Inc’s 2 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as Enphase.

3 of 3 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerUnited Renewable Energy2not in top list
Inverter makerEnphase221
Battery makerEnphase13

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 66 of 66 installs, inverters on 66. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Foothill Electric, Inc as developer on 4 battery storage projects and as installer on 4 (4 name it as both), 4 projects in all with 162 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Jun 17, 2020 to Jul 30, 2020.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled4162$159,700

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency4162$159,7000$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
494891FOOTHILL ELECTRIC INC (Corporation)CLEARC-10 Electrical ContractorJul 8, 1986Aug 31, 202846

License numbers are the ones the utilities recorded on the interconnection applications (46 of 66 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 494891. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Placer50
Nevada10
El Dorado3
Yolo2
San Joaquin1

Top cities

CityInstalls
Auburn20
Colfax9
Grass Valley6
Meadow Vista5
Foresthill4
Lincoln3
Newcastle2
Penn Valley2
Pilot Hill2
Rocklin2
Roseville2
El Dorado Hills1
Granite Bay1
Loomis1
Nevada City1

Names as recorded by the utilities

The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
FOOTHILL ELECTRIC INC18
Foothill Electric, Inc18
Foothill Electric15
Foothill Electric Inc12
Foothill Electric, Inc.2
Foothill Electric, inc1

Common questions

Where does Foothill Electric, Inc install solar?

Its installs are spread across 5 counties. The most are in Placer County (50 installs), followed by Nevada County (10).

How often does Foothill Electric, Inc install batteries with solar?

4.5% of its interconnected solar installs include battery storage across all years, and 50.0% in the last 24 months (1 of 2).

How many Foothill Electric, Inc installs are under NEM 3.0 (the Net Billing Tariff)?

1 of its 66 interconnected installs (1.5% of the 66 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.