eric welter electric

How many solar installs has eric welter electric done in California, and which license number is on its installs?

eric welter electric has 281 residential solar installs interconnected in California, active in the records from 2011 through 2026 (Dec 22, 2011 to Aug 25, 2026), most of them in San Diego County (279) and Orange County (2). CSLB lists license 1010508 (WELTER ELECTRIC OF SAN DIEGO) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jan 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
281
Last 24 months
32
Total capacity
1,637 kW DC
Median system size
5.5 kW DC
With battery storage
not recorded (SDG&E files batteries as separate projects, not on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
0.0% of 267 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
28 installs, latest Aug 25, 2026
Ownership types recorded
none recorded
First install
Dec 22, 2011
Latest install
Aug 25, 2026
Counties
2
Utilities
SDGE 281
CSLB license
1010508

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2011 to 2026

YearInstalls interconnectedWith battery storage
201110
201220
201330
201460
2015250
2016200
2017100
2018150
2019250
2020230
2021260
2022370
2023470
2024140
2025200
2026 (through Aug 31, 2026)70

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

28 of its 281 interconnected installs (10.0% of the 281 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Aug 25, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.05419.2%not counted
NEM 2.019970.8%not recorded
Net Billing Tariff2810.0%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on eric welter electric’s installs. No residential system in the file lists a third-party owner name that matches eric welter electric exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 32 of eric welter electric’s 32 installs name a module maker in the “Generator Manufacturer” fields, and most of those (18, 56.3%) used modules recorded as Qcells.

In the last 24 months, 32 of eric welter electric’s 32 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (14, 43.8%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells1856
REC1033
HDHYUNDAIENERGYSOLUTIONSCO.,LTD.1not in top list
JA Solar1not in top list
Panasonic1not in top list
Inverter makerEnphase14101
SolarEdge12164
Tesla66

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 280 of 281 installs, inverters on 278. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1010508WELTER ELECTRIC OF SAN DIEGO (Corporation)CLEARC-10 Electrical ContractorJan 22, 2016Jan 31, 2028232

License numbers are the ones the utilities recorded on the interconnection applications (232 of 281 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1010508. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list eric welter electric’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20182019202020212022202320242025Total
unincorporated San Diego County10105083463691335

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego279
Orange2

Top cities

CityInstalls
San Diego151
El Cajon18
La Jolla15
Encinitas12
La Mesa9
Santee9
Del Mar8
Alpine7
Solana Beach7
Chula Vista5
Escondido5
Cardiff4
Coronado4
Oceanside4
Imperial Beach3

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
eric welter electric278
Eric Welter Electric3

Common questions

Where does eric welter electric install solar?

Its installs are spread across 2 counties. The most are in San Diego County (279 installs), followed by Orange County (2).

How often does eric welter electric install batteries with solar?

Battery storage is not recorded on its interconnected solar installs: SDG&E files a battery as its own project record, not on the solar record.

How many eric welter electric installs are under NEM 3.0 (the Net Billing Tariff)?

28 of its 281 interconnected installs (10.0% of the 281 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.