ECO FORCE ELECTRIC INC

How many solar installs has ECO FORCE ELECTRIC INC done in California, and which license number is on its installs?

ECO FORCE ELECTRIC INC has 61 residential solar installs interconnected in California, active in the records from 2022 through 2026 (Mar 10, 2022 to Apr 13, 2026), most of them in Los Angeles County (19), Orange County (18) and San Bernardino County (14). CSLB lists license 1062299 (ECO FORCE ELECTRIC INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jan 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
61
Last 24 months
4
Total capacity
474.1 kW DC
Median system size
7.6 kW DC
With battery storage
3.3% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 25.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 61 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
18 installs, latest Apr 13, 2026
Ownership types recorded
none recorded
Median battery size
10.3 kWh (2 installs list a capacity)
First install
Mar 10, 2022
Latest install
Apr 13, 2026
Counties
5
Utilities
SCE 60, SDGE 1
CSLB license
1062299

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2022 to 2026

YearInstalls interconnectedWith battery storage
2022251
2023280
202450
202511
2026 (through Aug 31, 2026)20

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

18 of its 61 interconnected installs (29.5% of the 61 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 5.6% of those include battery storage. The latest Net Billing Tariff install was approved Apr 13, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.04370.5%1 (2.4%)
Net Billing Tariff1829.5%1 (5.6%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on ECO FORCE ELECTRIC INC’s installs. No residential system in the file lists a third-party owner name that matches ECO FORCE ELECTRIC INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 4 of ECO FORCE ELECTRIC INC’s 4 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (2, 50.0%) used modules recorded as Qcells.

In the last 24 months, 4 of ECO FORCE ELECTRIC INC’s 4 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (4, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 1 of ECO FORCE ELECTRIC INC’s 4 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as Enphase.

2 of 2 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells255
Hyundai11
LONGi11
Inverter makerEnphase436
Battery makerEnphase12

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 58 of 61 installs, inverters on 61. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1062299ECO FORCE ELECTRIC INC (Corporation)CLEARC-10 Electrical ContractorJan 14, 2020Jan 31, 202861

License numbers are the ones the utilities recorded on the interconnection applications (61 of 61 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1062299. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Los Angeles19
Orange18
San Bernardino14
Riverside9
Kern1

Top cities

CityInstalls
Fontana5
Anaheim4
Santa Ana3
Alta Loma2
Corona2
Cypress2
Garden Grove2
Hesperia2
La Mirada2
Moreno Valley2
Palmdale2
Rancho Cucamonga2
South Gate2
Whittier2
Apple Valley1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ECO FORCE ELECTRIC INC60
Eco Force Electric Inc1

Common questions

Where does ECO FORCE ELECTRIC INC install solar?

Its installs are spread across 5 counties. The most are in Los Angeles County (19 installs), followed by Orange County (18).

How often does ECO FORCE ELECTRIC INC install batteries with solar?

3.3% of its interconnected solar installs include battery storage across all years, and 25.0% in the last 24 months (1 of 4). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many ECO FORCE ELECTRIC INC installs are under NEM 3.0 (the Net Billing Tariff)?

18 of its 61 interconnected installs (29.5% of the 61 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 5.6% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.