ALLCOM ELECTRIC & DATA

How many solar installs has ALLCOM ELECTRIC & DATA done in California, and which license number is on its installs?

ALLCOM ELECTRIC & DATA has 61 residential solar installs interconnected in California, active in the records from 2017 through 2025 (Mar 17, 2017 to Mar 12, 2025), most of them in Placer County (48), El Dorado County (6) and Contra Costa County (3). CSLB lists license 818439 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Mar 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
61
Last 24 months
4
Total capacity
569.7 kW DC
Median system size
9.3 kW DC
With battery storage
3.3% all time; 0.0% last 24 months
Third-party owned
0.0% of 61 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Mar 17, 2017
Latest install
Mar 12, 2025
Counties
7
Utilities
PGE 61
CSLB license
818439

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2017 to 2026

YearInstalls interconnectedWith battery storage
201720
201820
201970
2020100
2021150
2022112
2023100
202430
202510
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 61 interconnected installs with a tariff recorded (61) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.061100.0%2 (3.3%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on ALLCOM ELECTRIC & DATA’s installs. No residential system in the file lists a third-party owner name that matches ALLCOM ELECTRIC & DATA exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 4 of ALLCOM ELECTRIC & DATA’s 4 installs name a module maker in the “Generator Manufacturer” fields, and most of those (4, 100.0%) used modules recorded as Qcells.

In the last 24 months, 4 of ALLCOM ELECTRIC & DATA’s 4 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (2, 50.0%) used inverters recorded as Enphase.

In the last 24 months, none of ALLCOM ELECTRIC & DATA’s 4 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

2 of 2 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells420
Inverter makerEnphase216
SolarEdge245
Battery makerEnphase02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 60 of 61 installs, inverters on 61. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
818439Sole owner license (name not shown)CLEARC-10 Electrical ContractorMar 28, 2003Mar 31, 202761

License numbers are the ones the utilities recorded on the interconnection applications (61 of 61 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 818439. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Placer48
El Dorado6
Contra Costa3
Alameda1
Calaveras1
Tuolumne1
Yolo1

Top cities

CityInstalls
Auburn16
Granite Bay12
El Dorado Hills5
Meadow Vista5
Rocklin5
Loomis4
Lincoln3
Pleasant Hill2
Applegate1
Concord1
Cool1
Fremont1
La Grange1
Newcastle1
San Andreas1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ALLCOM ELECTRIC & DATA59
allcom electric & data2

Common questions

Where does ALLCOM ELECTRIC & DATA install solar?

Its installs are spread across 7 counties. The most are in Placer County (48 installs), followed by El Dorado County (6).

How often does ALLCOM ELECTRIC & DATA install batteries with solar?

3.3% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 4).

How many ALLCOM ELECTRIC & DATA installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 61 interconnected installs with a tariff recorded (61) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.