A PLUS QUALITY CONSTRUCTION INC

How many solar installs has A PLUS QUALITY CONSTRUCTION INC done in California, and which license number is on its installs?

A PLUS QUALITY CONSTRUCTION INC has 58 residential solar installs interconnected in California, active in the records from 2014 through 2024 (Mar 4, 2014 to Mar 26, 2024), most of them in San Diego County (41) and Orange County (17). CSLB lists license 810245 (A PLUS ROOFING AND CONSTRUCTION INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-39, expires Jul 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
58
Last 24 months
0
Total capacity
500.6 kW DC
Median system size
6.2 kW DC
With battery storage
not recorded (SDG&E files batteries as separate projects, not on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 56 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Mar 4, 2014
Latest install
Mar 26, 2024
Counties
2
Utilities
SDGE 58
CSLB license
810245

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
201410
201590
201660
201730
2018180
201950
202040
202160
202200
202310
202450
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 58 interconnected installs with a tariff recorded (58) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.01424.1%not counted
NEM 2.04475.9%not recorded
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on A PLUS QUALITY CONSTRUCTION INC’s installs. No residential system in the file lists a third-party owner name that matches A PLUS QUALITY CONSTRUCTION INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 54 of A PLUS QUALITY CONSTRUCTION INC’s 58 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (22, 40.7%) used modules recorded as JinkoSolar.

Across all years, 58 of A PLUS QUALITY CONSTRUCTION INC’s 58 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (22, 37.9%) used inverters recorded as SolarEdge.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerJinkoSolar022
Qcells012
LG09
Canadian Solar07
LONGi01
Inverter makerSolarEdge022
Enphase019
SMA017

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 54 of 58 installs, inverters on 58. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
810245A PLUS ROOFING AND CONSTRUCTION INC (Corporation)CLEARB General Building Contractor; C-39 Roofing ContractorJul 3, 2002Jul 31, 202844

License numbers are the ones the utilities recorded on the interconnection applications (46 of 58 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 810245. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list A PLUS QUALITY CONSTRUCTION INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023Total
unincorporated San Diego County81024531361620

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego41
Orange17

Top cities

CityInstalls
San Diego23
Borrego Springs16
El Cajon5
Bonita2
Coronado2
Imperial Beach2
Spring Valley2
Encinitas1
La Jolla1
La Mesa1
Poway1
Ramona1
Vista1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
A PLUS QUALITY CONSTRUCTION INC58

Common questions

Where does A PLUS QUALITY CONSTRUCTION INC install solar?

Its installs are spread across 2 counties. The most are in San Diego County (41 installs), followed by Orange County (17).

How often does A PLUS QUALITY CONSTRUCTION INC install batteries with solar?

Battery storage is not recorded on its interconnected solar installs: SDG&E files a battery as its own project record, not on the solar record.

How many A PLUS QUALITY CONSTRUCTION INC installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 58 interconnected installs with a tariff recorded (58) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.