Home solar in ZIP code 93513, California

Service city recorded on most installs: Big Pine. County: Inyo County.

How many homes in ZIP code 93513 have solar?

PG&E, SCE and SDG&E interconnected 40 residential solar systems in ZIP code 93513 through Aug 31, 2026, 10 of them in the last 24 months (Sep 2024 through Aug 2026). The utilities recorded Big Pine, Inyo County, as the service city on 40 of them. BERGER SOLAR ELECTRIC LLC has the most installs recorded in this ZIP, 17.

Counts of interconnected systems from utility records, not a rating of any installer.

Data: California DG Stats interconnection records (Interconnected_Project_Sites_2026-08-31.zip), which run through Aug 31, 2026. ZIP codes are the service ZIP the utility recorded on each project.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

At a glance

Residential solar installs
40
Last 24 months
10 (Sep 2024 through Aug 2026)
Capacity
278 kW DC
Median system size
6.6 kW DC
Net Billing Tariff (NEM 3.0)
10 installs, 25.0% of those with a tariff recorded
Utility
SCE 40
First install in data
May 20, 2010
Latest install in data
Jul 7, 2026

Installs by year

YearInstalls interconnectedWith battery storage
201010
201100
201200
201300
201400
201500
201600
201720
201810
201940
202060
202110
202221
2023111
202431
202566
2026 (through Aug 31, 2026)33

Battery storage

30.0% of the residential solar installs here include battery storage across all years (12 of 40). In the last 24 months the share was 90.0% (9 of 10).

Net metering tariff

Of the 40 installs with a net metering tariff recorded: NEM 1.0 3 (7.5%), NEM 2.0 27 (67.5%), the Net Billing Tariff (often called NEM 3.0) 10 (25.0%). The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Lease, PPA or owned

17.5% of the 40 installs with ownership recorded are third-party owned (a lease or power purchase agreement); the other 33 are recorded as not third-party owned. Ownership types recorded: PPA 5, lease 1, other 1.

Installers by installs in 93513

Installers with a page in this index, most installs in this ZIP first. 10 such installers have at least one install here. 4 more installs were by 3 installer names without a page in this index. 1 were self-installed or had no installer recorded. Counts of connected systems, not a rating.

InstallerInstalls in 93513Last 24 months
BERGER SOLAR ELECTRIC LLC173
SolarSun Co50
HIGH POINT SOLAR31
MMC ELECTRIC INC33
LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC22
BRYTON POWER LLC11
GREEN SOLAR TECH CALIFORNIA INC10
Highpoint Solar10
Solcius10
Titan Solar Power CA inc10

City and county recorded for 93513

The Service City and Service County the utilities entered on this ZIP’s installs, as recorded. No outside ZIP directory is used.

Recorded asInstalls
City: Big Pine40
County: Inyo County40

Common questions

How common are home batteries with solar in 93513?

30.0% of the residential solar installs here include battery storage across all years (12 of 40). In the last 24 months the share was 90.0% (9 of 10).

How many solar installs in 93513 are under NEM 3.0?

10 of the 40 installs here with a tariff recorded (25.0%) were interconnected under the Net Billing Tariff, often called NEM 3.0, which applies to interconnection applications submitted on or after April 15, 2023.

Which solar installers have the most installs in 93513?

Among installers with a page in this index, by installs interconnected here through Aug 31, 2026: BERGER SOLAR ELECTRIC LLC (17), SolarSun Co (5), HIGH POINT SOLAR (3). These are counts of connected systems, not a rating of price, workmanship or service.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.