Highpoint Solar

How many solar installs has Highpoint Solar done in California, and which license number is on its installs?

Highpoint Solar has 45 residential solar installs interconnected in California, active in the records from 2009 through 2019 (Aug 13, 2009 to Jun 27, 2019), most of them in Inyo County (25), Mono County (17) and Kern County (3). CSLB lists license 907086 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-46, expires Nov 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
45
Last 24 months
0
Total capacity
264.4 kW DC
Median system size
5.1 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
5.0% of 40 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
other 2
First install
Aug 13, 2009
Latest install
Jun 27, 2019
Counties
3
Utilities
SCE 45
CSLB license
907086

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2009 to 2026

YearInstalls interconnectedWith battery storage
200950
201060
201120
201250
201330
201450
201590
201640
201720
201820
201920
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 45 interconnected installs with a tariff recorded (45) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.04088.9%not counted
NEM 2.0511.1%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 2 of Highpoint Solar’s installs the utility recorded a third-party ownership type: PPA 0, lease 0, prepaid lease 0, other 2. No residential system in the file lists a third-party owner name that matches Highpoint Solar exactly.

Third-party owner named on its installsInstalls
Smith, gordon2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 15 of Highpoint Solar’s 45 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (6, 40.0%) used modules recorded as SolarWorld.

Across all years, 45 of Highpoint Solar’s 45 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (17, 37.8%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSolarWorld06
Canadian Solar04
Qcells04
SunPower01
Inverter makerEnphase017
Fronius012
SMA011
Kaco02
ABB01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 15 of 45 installs, inverters on 45. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Highpoint Solar as developer on 1 battery storage project and as installer on 1 (1 name it as both), 1 projects in all with 19 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Oct 8, 2024 to Oct 8, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Reserved119$2,912

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage119$2,9120$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
907086Sole owner license (name not shown)CLEARB General Building Contractor; C-10 Electrical Contractor; C-46 Solar ContractorNov 27, 2007Nov 30, 202745

License numbers are the ones the utilities recorded on the interconnection applications (45 of 45 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 907086. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Inyo25
Mono17
Kern3

Top cities

CityInstalls
Bishop24
Crowley Lake7
Mammoth Lakes5
Benton3
Ridgecrest3
Big Pine1
Bridgeport1
June Lake1

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
HIGHPOINT SOLAR34
Highpoint Solar9
Highpoint Solar Inc1
HIGHPOINT SOLAR INC1

Common questions

Where does Highpoint Solar install solar?

Its installs are spread across 3 counties. The most are in Inyo County (25 installs), followed by Mono County (17).

How often does Highpoint Solar install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Highpoint Solar installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 45 interconnected installs with a tariff recorded (45) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.