Home solar in ZIP code 93280, California
Service city recorded on most installs: Wasco. County: Kern County.
How many homes in ZIP code 93280 have solar?
PG&E, SCE and SDG&E interconnected 1,843 residential solar systems in ZIP code 93280 through Aug 31, 2026, 275 of them in the last 24 months (Sep 2024 through Aug 2026). The utilities recorded Wasco, Kern County, as the service city on 1,840 of them. Sunrun has the most installs recorded in this ZIP, 417.
Counts of interconnected systems from utility records, not a rating of any installer.
Data: California DG Stats interconnection records (Interconnected_Project_Sites_2026-08-31.zip), which run through Aug 31, 2026. ZIP codes are the service ZIP the utility recorded on each project.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
At a glance
- Residential solar installs
- 1,843
- Last 24 months
- 275 (Sep 2024 through Aug 2026)
- Capacity
- 12.3 MW DC
- Median system size
- 6 kW DC
- Net Billing Tariff (NEM 3.0)
- 430 installs, 23.3% of those with a tariff recorded
- Utility
- PGE 1,841, SCE 2
- First install in data
- Jul 8, 2005
- Latest install in data
- Aug 17, 2026
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2005 | 2 | 0 |
| 2006 | 3 | 0 |
| 2007 | 0 | 0 |
| 2008 | 0 | 0 |
| 2009 | 3 | 0 |
| 2010 | 1 | 0 |
| 2011 | 1 | 0 |
| 2012 | 8 | 0 |
| 2013 | 10 | 0 |
| 2014 | 31 | 0 |
| 2015 | 79 | 0 |
| 2016 | 107 | 0 |
| 2017 | 95 | 0 |
| 2018 | 66 | 0 |
| 2019 | 96 | 2 |
| 2020 | 112 | 5 |
| 2021 | 171 | 3 |
| 2022 | 262 | 2 |
| 2023 | 361 | 28 |
| 2024 | 224 | 176 |
| 2025 | 145 | 140 |
| 2026 (through Aug 31, 2026) | 66 | 63 |
Battery storage
22.7% of the residential solar installs here include battery storage across all years (419 of 1,843). In the last 24 months the share was 96.0% (264 of 275).
Net metering tariff
Of the 1,843 installs with a net metering tariff recorded: NEM 1.0 250 (13.6%), NEM 2.0 1,163 (63.1%), the Net Billing Tariff (often called NEM 3.0) 430 (23.3%). The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Lease, PPA or owned
51.9% of the 1,843 installs with ownership recorded are third-party owned (a lease or power purchase agreement); the other 886 are recorded as not third-party owned. Ownership types recorded: PPA 829, lease 96, prepaid lease 2, other 30.
Installers by installs in 93280
Installers with a page in this index, most installs in this ZIP first. 149 such installers have at least one install here. 23 more installs were by 18 installer names without a page in this index. 21 were self-installed or had no installer recorded. Counts of connected systems, not a rating.
| Installer | Installs in 93280 | Last 24 months |
|---|---|---|
| Sunrun | 417 | 139 |
| Infinity Energy, Inc | 170 | 0 |
| Vivint Solar Developer, LLC | 126 | 0 |
| Tesla Energy Operations (formerly SolarCity) | 123 | 2 |
| Divine Power USA | 102 | 0 |
| 1st Light Energy Inc | 54 | 0 |
| LIFT ENERGY CONSTRUCTION INC | 54 | 0 |
| FREEDOM FOREVER LLC | 48 | 10 |
| SOLGEN ELECTRIC | 47 | 0 |
| NEXT PHASE ELECTRIC INC | 33 | 3 |
City and county recorded for 93280
The Service City and Service County the utilities entered on this ZIP’s installs, as recorded. No outside ZIP directory is used.
| Recorded as | Installs |
|---|---|
| City: Wasco | 1,840 |
| County: Kern County | 1,842 |
3 other city values on 3 installs; 1 other county on 1 install, each under 1% of this ZIP’s installs, are not listed.
Common questions
How common are home batteries with solar in 93280?
22.7% of the residential solar installs here include battery storage across all years (419 of 1,843). In the last 24 months the share was 96.0% (264 of 275).
How many solar installs in 93280 are under NEM 3.0?
430 of the 1,843 installs here with a tariff recorded (23.3%) were interconnected under the Net Billing Tariff, often called NEM 3.0, which applies to interconnection applications submitted on or after April 15, 2023.
Which solar installers have the most installs in 93280?
Among installers with a page in this index, by installs interconnected here through Aug 31, 2026: Sunrun (417), Infinity Energy, Inc (170), Vivint Solar Developer, LLC (126). These are counts of connected systems, not a rating of price, workmanship or service.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.