Western Sierra has 137 residential solar installs interconnected in California, active in the records from 2011 through 2026 (Apr 18, 2011 to Apr 14, 2026), most of them in Contra Costa County (107), Alameda County (13) and Solano County (11). CSLB lists license 957460 (WESTERN SIERRA INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-39, C-43, expires Aug 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
137
Last 24 months
6
Total capacity
869.1 kW DC
Median system size
5.9 kW DC
With battery storage
8.0% all time; 16.7% last 24 months
Third-party owned
0.7% of 137 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
6 installs, latest Aug 16, 2025
Ownership types recorded
PPA 1
Median battery size
34.2 kWh (1 installs list a capacity)
First install
Apr 18, 2011
Latest install
Apr 14, 2026
Counties
5
Utilities
PGE 137
CSLB license
957460

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2011 to 2026

YearInstalls interconnectedWith battery storage
201110
201220
201360
201480
2015130
201690
201760
2018100
2019130
2020100
202192
2022131
2023275
202453
202540
2026 (through Aug 31, 2026)10

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

6 of its 137 interconnected installs (4.4% of the 137 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.0% of those include battery storage. The latest Net Billing Tariff install was approved Aug 16, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.03928.5%not counted
NEM 2.09267.2%8 (8.7%)
Net Billing Tariff64.4%3 (50.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of Western Sierra’s installs the utility recorded a third-party ownership type: PPA 1, lease 0, prepaid lease 0, other 0. Across all installers, 1 residential systems list a third-party owner name that matches Western Sierra exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
western sierra1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 6 of Western Sierra’s 6 installs name a module maker in the “Generator Manufacturer” fields, and most of those (6, 100.0%) used modules recorded as REC.

In the last 24 months, 6 of Western Sierra’s 6 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (4, 66.7%) used inverters recorded as Enphase.

In the last 24 months, 1 of Western Sierra’s 6 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as Tesla.

8 of 11 battery-paired PG&E and SCE installs (72.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC617
Inverter makerEnphase4103
Tesla24
Battery makerTesla13

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 136 of 137 installs, inverters on 136. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
957460WESTERN SIERRA INC (Corporation)CLEARB General Building Contractor; C-39 Roofing Contractor; C-43Feb 8, 2011Aug 31, 2028127

License numbers are the ones the utilities recorded on the interconnection applications (127 of 137 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 957460. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Contra Costa107
Alameda13
Solano11
Sonoma4
Marin2

Top cities

CityInstalls
Concord16
Walnut Creek16
Martinez11
Benicia6
Pleasant Hill6
Alamo5
Antioch5
Clayton5
Lafayette5
Brentwood4
Discovery Bay4
Oakland4
Richmond4
San Ramon4
Moraga3

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
WESTERN SIERRA INC65
western sierra32
Western Sierra25
WESTERN SIERRA14
Western Sierra Inc1

Common questions

Where does Western Sierra install solar?

Its installs are spread across 5 counties. The most are in Contra Costa County (107 installs), followed by Alameda County (13).

How often does Western Sierra install batteries with solar?

8.0% of its interconnected solar installs include battery storage across all years, and 16.7% in the last 24 months (1 of 6).

How many Western Sierra installs are under NEM 3.0 (the Net Billing Tariff)?

6 of its 137 interconnected installs (4.4% of the 137 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.