Solight Energy Solutions

How many solar installs has Solight Energy Solutions done in California, and which license number is on its installs?

Solight Energy Solutions has 48 residential solar installs interconnected in California, active in the records from 2019 through 2023 (Jul 19, 2019 to Aug 30, 2023), most of them in Orange County (43) and San Diego County (5). CSLB lists license 982533 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-46, expires Apr 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
48
Last 24 months
0
Total capacity
457.9 kW DC
Median system size
9.1 kW DC
With battery storage
not recorded (SDG&E files batteries as separate projects, not on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 48 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Jul 19, 2019
Latest install
Aug 30, 2023
Counties
2
Utilities
SDGE 48
CSLB license
982533

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
2019110
202050
2021140
2022140
202340
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 48 interconnected installs with a tariff recorded (48) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.048100.0%not recorded
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Solight Energy Solutions’s installs. No residential system in the file lists a third-party owner name that matches Solight Energy Solutions exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 48 of Solight Energy Solutions’ 48 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (16, 33.3%) used modules recorded as REC.

Across all years, 48 of Solight Energy Solutions’ 48 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (26, 54.2%) used inverters recorded as SolarEdge.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC016
Solaria013
LG07
Qcells06
SEGSolarInc.04
Inverter makerSolarEdge026
Enphase022

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 48 of 48 installs, inverters on 48. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
982533Sole owner license (name not shown)CLEARC-46 Solar ContractorApr 5, 2013Apr 30, 202747

License numbers are the ones the utilities recorded on the interconnection applications (48 of 48 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 982533. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Orange43
San Diego5

Top cities

CityInstalls
Dana Point15
South Laguna8
San Clemente7
San Juan Capo6
Laguna Niguel4
Ladera Ranch3
Capistrano Bch2
Carlsbad1
Laguna Beach1
San Juan Capistrano1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Solight Energy Solutions48

Common questions

Where does Solight Energy Solutions install solar?

Its installs are spread across 2 counties. The most are in Orange County (43 installs), followed by San Diego County (5).

How often does Solight Energy Solutions install batteries with solar?

Battery storage is not recorded on its interconnected solar installs: SDG&E files a battery as its own project record, not on the solar record.

How many Solight Energy Solutions installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 48 interconnected installs with a tariff recorded (48) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.