Solight Energy Solutions
How many solar installs has Solight Energy Solutions done in California, and which license number is on its installs?
Solight Energy Solutions has 48 residential solar installs interconnected in California, active in the records from 2019 through 2023 (Jul 19, 2019 to Aug 30, 2023), most of them in Orange County (43) and San Diego County (5). CSLB lists license 982533 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-46, expires Apr 30, 2027.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 48
- Last 24 months
- 0
- Total capacity
- 457.9 kW DC
- Median system size
- 9.1 kW DC
- With battery storage
- not recorded (SDG&E files batteries as separate projects, not on the solar record) all time; no installs in the last 24 months last 24 months
- Third-party owned
- 0.0% of 48 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 0 installs
- Ownership types recorded
- none recorded
- First install
- Jul 19, 2019
- Latest install
- Aug 30, 2023
- Counties
- 2
- Utilities
- SDGE 48
- CSLB license
- 982533
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2019 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2019 | 11 | 0 |
| 2020 | 5 | 0 |
| 2021 | 14 | 0 |
| 2022 | 14 | 0 |
| 2023 | 4 | 0 |
| 2024 | 0 | 0 |
| 2025 | 0 | 0 |
| 2026 (through Aug 31, 2026) | 0 | 0 |
The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
None of its 48 interconnected installs with a tariff recorded (48) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 0 | 0.0% | not counted |
| NEM 2.0 | 48 | 100.0% | not recorded |
| Net Billing Tariff | 0 | 0.0% | 0 |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.
Leases, PPAs and third-party owners
The utilities recorded no third-party ownership type (PPA or lease) on Solight Energy Solutions’s installs. No residential system in the file lists a third-party owner name that matches Solight Energy Solutions exactly.
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
Across all years, 48 of Solight Energy Solutions’ 48 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (16, 33.3%) used modules recorded as REC.
Across all years, 48 of Solight Energy Solutions’ 48 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (26, 54.2%) used inverters recorded as SolarEdge.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | REC | 0 | 16 |
| Solaria | 0 | 13 | |
| LG | 0 | 7 | |
| Qcells | 0 | 6 | |
| SEGSolarInc. | 0 | 4 | |
| Inverter maker | SolarEdge | 0 | 26 |
| Enphase | 0 | 22 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 48 of 48 installs, inverters on 48. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 982533 | Sole owner license (name not shown) | CLEAR | C-46 Solar Contractor | Apr 5, 2013 | Apr 30, 2027 | 47 |
License numbers are the ones the utilities recorded on the interconnection applications (48 of 48 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 982533. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Other names reported under the same license
- Sadler Solar Development: 268 installs, license 982533
Counties
Top cities
| City | Installs |
|---|---|
| Dana Point | 15 |
| South Laguna | 8 |
| San Clemente | 7 |
| San Juan Capo | 6 |
| Laguna Niguel | 4 |
| Ladera Ranch | 3 |
| Capistrano Bch | 2 |
| Carlsbad | 1 |
| Laguna Beach | 1 |
| San Juan Capistrano | 1 |
Names as recorded by the utilities
The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| Solight Energy Solutions | 48 |
Common questions
Where does Solight Energy Solutions install solar?
Its installs are spread across 2 counties. The most are in Orange County (43 installs), followed by San Diego County (5).
How often does Solight Energy Solutions install batteries with solar?
Battery storage is not recorded on its interconnected solar installs: SDG&E files a battery as its own project record, not on the solar record.
How many Solight Energy Solutions installs are under NEM 3.0 (the Net Billing Tariff)?
None of its 48 interconnected installs with a tariff recorded (48) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.