SOLAR XPRESS INC

How many solar installs has SOLAR XPRESS INC done in California, and which license number is on its installs?

SOLAR XPRESS INC has 102 residential solar installs interconnected in California, active in the records from 2006 through 2026 (Jul 27, 2006 to Aug 21, 2026), most of them in Los Angeles County (79), Ventura County (21) and Riverside County (2). CSLB lists license 991559 (SOLAR XPRESS INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-46, expires Mar 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
102
Last 24 months
11
Total capacity
912.4 kW DC
Median system size
8.7 kW DC
With battery storage
0.0% all time; 0.0% last 24 months
Third-party owned
0.0% of 92 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
13 installs, latest Aug 21, 2026
Ownership types recorded
none recorded
First install
Jul 27, 2006
Latest install
Aug 21, 2026
Counties
3
Utilities
SCE 102
CSLB license
991559

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2006 to 2026

YearInstalls interconnectedWith battery storage
200620
200700
200800
200900
201000
201100
201200
201300
201430
201580
201650
201770
201870
2019120
2020100
2021110
2022130
2023130
202450
202540
2026 (through Aug 31, 2026)20

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

13 of its 102 interconnected installs (12.7% of the 102 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Aug 21, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.02221.6%not counted
NEM 2.06765.7%0 (0.0%)
Net Billing Tariff1312.7%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on SOLAR XPRESS INC’s installs. No residential system in the file lists a third-party owner name that matches SOLAR XPRESS INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 11 of SOLAR XPRESS INC’s 11 installs name a module maker in the “Generator Manufacturer” fields, and most of those (8, 72.7%) used modules recorded as Qcells.

In the last 24 months, 11 of SOLAR XPRESS INC’s 11 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (11, 100.0%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells824
LONGi2not in top list
Silfab1not in top list
Inverter makerEnphase1162

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 90 of 102 installs, inverters on 102. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
991559SOLAR XPRESS INC (Corporation)CLEARC-46 Solar ContractorMar 22, 2014Mar 31, 2028100

License numbers are the ones the utilities recorded on the interconnection applications (102 of 102 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 991559. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Los Angeles79
Ventura21
Riverside2

Top cities

CityInstalls
Calabasas39
Agoura Hills9
Glendora5
Moorpark5
Westlake Village5
Oak Park4
Thousand Oaks4
Beverly Hills3
La Canada3
Newbury Park3
Santa Monica3
Simi Valley3
Camarillo1
Canyon Country1
Culver City1

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SOLAR XPRESS INC81
SOLAR XPRESS20
Solar Xpress1

Common questions

Where does SOLAR XPRESS INC install solar?

Its installs are spread across 3 counties. The most are in Los Angeles County (79 installs), followed by Ventura County (21).

How often does SOLAR XPRESS INC install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 11).

How many SOLAR XPRESS INC installs are under NEM 3.0 (the Net Billing Tariff)?

13 of its 102 interconnected installs (12.7% of the 102 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.