SOLAR MOTION has 37 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Aug 19, 2019 to Jul 27, 2026), most of them in Santa Clara County (20), Santa Cruz County (6) and Monterey County (5). CSLB lists license 1050433 (SOLAR MOTION) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-46, expires Feb 28, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
37
Last 24 months
5
Total capacity
242.8 kW DC
Median system size
6.2 kW DC
With battery storage
40.5% all time; 100.0% last 24 months
Third-party owned
2.7% of 37 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
6 installs, latest Jul 27, 2026
Ownership types recorded
prepaid lease 1
Median battery size
13.5 kWh (3 installs list a capacity)
First install
Aug 19, 2019
Latest install
Jul 27, 2026
Counties
6
Utilities
PGE 37
CSLB license
1050433

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
201920
202020
202171
202262
2023125
202432
202533
2026 (through Aug 31, 2026)22

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

6 of its 37 interconnected installs (16.2% of the 37 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The latest Net Billing Tariff install was approved Jul 27, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.03183.8%9 (29.0%)
Net Billing Tariff616.2%6 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of SOLAR MOTION’s installs the utility recorded a third-party ownership type: PPA 0, lease 0, prepaid lease 1, other 0. No residential system in the file lists a third-party owner name that matches SOLAR MOTION exactly.

Third-party owner named on its installsInstalls
HDM Capital1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 5 of SOLAR MOTION’s 5 installs name a module maker in the “Generator Manufacturer” fields, and most of those (5, 100.0%) used modules recorded as REC.

In the last 24 months, 5 of SOLAR MOTION’s 5 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (3, 60.0%) used inverters recorded as Tesla.

In the last 24 months, 5 of SOLAR MOTION’s 5 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (3, 60.0%) used batteries recorded as Tesla.

15 of 15 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC528
Inverter makerTesla33
Enphase230
FranklinWH12
Battery makerTesla33
Enphase17
FranklinWH12

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 37 of 37 installs, inverters on 37. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1050433SOLAR MOTION (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-46 Solar ContractorFeb 21, 2019Feb 28, 202737

License numbers are the ones the utilities recorded on the interconnection applications (37 of 37 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1050433. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list SOLAR MOTION’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2021Total
City and County of San Francisco105043311

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Santa Clara20
Santa Cruz6
Monterey5
San Mateo4
San Benito1
San Francisco1

Top cities

CityInstalls
San Jose12
Los Gatos4
Salinas4
Santa Cruz4
Cupertino3
Menlo Park3
Belmont1
Carmel1
Morgan Hill1
Mountain View1
San Francisco1
San Juan Bautista1
Saratoga1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SOLAR MOTION36
Solar Motion1

Common questions

Where does SOLAR MOTION install solar?

Its installs are spread across 6 counties. The most are in Santa Clara County (20 installs), followed by Santa Cruz County (6).

How often does SOLAR MOTION install batteries with solar?

40.5% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (5 of 5).

How many SOLAR MOTION installs are under NEM 3.0 (the Net Billing Tariff)?

6 of its 37 interconnected installs (16.2% of the 37 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.