Sawmill Solar Electric

How many solar installs has Sawmill Solar Electric done in California, and which license number is on its installs?

Sawmill Solar Electric has 103 residential solar installs interconnected in California, active in the records from 2010 through 2025 (Dec 22, 2010 to Dec 23, 2025), most of them in Kern County (98), Tulare County (2) and Los Angeles County (1). CSLB lists license 952268 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, D-30, expires Sep 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
103
Last 24 months
5
Total capacity
839.9 kW DC
Median system size
7.8 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 103 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Dec 22, 2010
Latest install
Dec 23, 2025
Counties
5
Utilities
PGE 85, SCE 17, SDGE 1
CSLB license
952268

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
201010
201150
201260
201390
2014150
2015180
2016140
201790
201850
201950
202000
202150
202230
202310
202440
202530
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 103 interconnected installs with a tariff recorded (103) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.06967.0%not counted
NEM 2.03433.0%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Sawmill Solar Electric’s installs. No residential system in the file lists a third-party owner name that matches Sawmill Solar Electric exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 5 of Sawmill Solar Electric’s 5 installs name a module maker in the “Generator Manufacturer” fields, and most of those (5, 100.0%) used modules recorded as Qcells.

In the last 24 months, 5 of Sawmill Solar Electric’s 5 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (2, 40.0%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells511
Inverter makerEnphase288
Sol-Ark22
ABB11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 100 of 103 installs, inverters on 103. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
952268Sole owner license (name not shown)CLEARC-10 Electrical Contractor; D-30Sep 14, 2010Sep 30, 202871

License numbers are the ones the utilities recorded on the interconnection applications (73 of 103 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 952268. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Kern98
Tulare2
Los Angeles1
Monterey1
San Diego1

Top cities

CityInstalls
Bakersfield83
Lake Isabella5
Tehachapi3
Visalia2
Wofford Heights2
Caliente1
Kernville1
Montebello1
Ridgecrest1
Rosamond1
Salinas1
San Diego1
Taft1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Sawmill Solar Electric83
SAWMILL SOLAR ELECTRIC20

Common questions

Where does Sawmill Solar Electric install solar?

Its installs are spread across 5 counties. The most are in Kern County (98 installs), followed by Tulare County (2).

How often does Sawmill Solar Electric install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 4). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Sawmill Solar Electric installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 103 interconnected installs with a tariff recorded (103) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.