RADIX SOLAR

How many solar installs has RADIX SOLAR done in California, and which license number is on its installs?

RADIX SOLAR has 46 residential solar installs interconnected in California, active in the records from 2024 through 2025 (Mar 11, 2024 to Aug 4, 2025), most of them in San Luis Obispo County (17), Santa Barbara County (13) and Los Angeles County (5). The license number recorded on most of its installs, 1102097, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
46
Last 24 months
19
Total capacity
222.3 kW DC
Median system size
4 kW DC
With battery storage
89.1% all time; 94.7% last 24 months
Third-party owned
67.4% of 46 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
45 installs, latest Aug 4, 2025
Ownership types recorded
PPA 31
Median battery size
10 kWh (15 installs list a capacity)
First install
Mar 11, 2024
Latest install
Aug 4, 2025
Counties
7
Utilities
PGE 32, SCE 14
CSLB license
1102097

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2024 to 2026

YearInstalls interconnectedWith battery storage
20243935
202576
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

45 of its 46 interconnected installs (97.8% of the 46 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 88.9% of those include battery storage. The latest Net Billing Tariff install was approved Aug 4, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.012.2%not counted
NEM 2.000.0%0
Net Billing Tariff4597.8%40 (88.9%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 31 of RADIX SOLAR’s installs the utility recorded a third-party ownership type: PPA 31, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches RADIX SOLAR exactly.

Third-party owner named on its installsInstalls
Lightreach30
Light Reach1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 19 of RADIX SOLAR’s 19 installs name a module maker in the “Generator Manufacturer” fields, and most of those (16, 84.2%) used modules recorded as SEG Solar.

In the last 24 months, 19 of RADIX SOLAR’s 19 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (15, 78.9%) used inverters recorded as Enphase.

In the last 24 months, 18 of RADIX SOLAR’s 19 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (14, 77.8%) used batteries recorded as Enphase.

40 of 41 battery-paired PG&E and SCE installs (97.6%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSEG Solar1638
JA Solar22
Aptos Solar11
Inverter makerEnphase1541
Tesla45
Battery makerEnphase1435
Tesla45

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 45 of 46 installs, inverters on 46. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1102097Not found in the CSLB License Master file pulled Nov 4, 202646

License numbers are the ones the utilities recorded on the interconnection applications (46 of 46 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
San Luis Obispo17
Santa Barbara13
Los Angeles5
Alameda3
Tulare3
Ventura3
Kern2

Top cities

CityInstalls
Santa Maria12
Los Osos5
Arroyo Grande4
Albany3
Ventura3
Palmdale2
Paso Robles2
Visalia2
Atascadero1
Grover Beach1
Lancaster1
Littlerock1
Nipomo1
Oceano1
Pearblossom1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
RADIX SOLAR46

Common questions

Where does RADIX SOLAR install solar?

Its installs are spread across 7 counties. The most are in San Luis Obispo County (17 installs), followed by Santa Barbara County (13).

How often does RADIX SOLAR install batteries with solar?

89.1% of its interconnected solar installs include battery storage across all years, and 94.7% in the last 24 months (18 of 19).

How many RADIX SOLAR installs are under NEM 3.0 (the Net Billing Tariff)?

45 of its 46 interconnected installs (97.8% of the 46 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 88.9% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.