PHOENIX CONSTRUCTION CO INC

How many solar installs has PHOENIX CONSTRUCTION CO INC done in California, and which license number is on its installs?

PHOENIX CONSTRUCTION CO INC has 41 residential solar installs interconnected in California, active in the records from 2011 through 2023 (Nov 20, 2011 to Dec 7, 2023), most of them in San Joaquin County (30), Alameda County (3) and Contra Costa County (3). CSLB lists license 1005786 (PHOENIX CONSTRUCTION CO INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Jul 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
41
Last 24 months
0
Total capacity
320 kW DC
Median system size
7.6 kW DC
With battery storage
4.9% all time; no installs in the last 24 months last 24 months
Third-party owned
2.4% of 41 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
lease 1
First install
Nov 20, 2011
Latest install
Dec 7, 2023
Counties
7
Utilities
PGE 41
CSLB license
1005786

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2011 to 2026

YearInstalls interconnectedWith battery storage
201110
201200
201300
201400
201500
201600
201710
201800
201900
2020100
2021171
202220
2023101
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 41 interconnected installs with a tariff recorded (41) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.012.4%not counted
NEM 2.04097.6%2 (5.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of PHOENIX CONSTRUCTION CO INC’s installs the utility recorded a third-party ownership type: PPA 0, lease 1, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches PHOENIX CONSTRUCTION CO INC exactly.

Third-party owner named on its installsInstalls
Sungage1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 41 of PHOENIX CONSTRUCTION CO INC’s 41 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (19, 46.3%) used modules recorded as Qcells.

Across all years, 41 of PHOENIX CONSTRUCTION CO INC’s 41 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (37, 90.2%) used inverters recorded as Enphase.

Across all years, 2 of PHOENIX CONSTRUCTION CO INC’s 41 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (1, 50.0%) used batteries recorded as Enphase.

2 of 2 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells019
CertainTeed014
Certain Teed05
Canadian Solar01
JinkoSolar01
Inverter makerEnphase037
SolarEdge02
Generac01
PV Powered01
Battery makerEnphase01
Generac01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 41 of 41 installs, inverters on 41. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1005786PHOENIX CONSTRUCTION CO INC (Corporation)CLEARB General Building ContractorJul 23, 2015Jul 31, 202739

License numbers are the ones the utilities recorded on the interconnection applications (40 of 41 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1005786. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
San Joaquin30
Alameda3
Contra Costa3
Stanislaus2
Calaveras1
San Luis Obispo1
Santa Clara1

Top cities

CityInstalls
Stockton25
Acampo3
Livermore2
Riverbank2
Alamo1
Angels Camp1
Antioch1
Concord1
Dublin1
Escalon1
Gilroy1
Paso Robles1
Tracy1

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
PHOENIX CONSTRUCTION CO INC39
Phoenix Construction1
PHOENIX CONSTRUCTION1

Common questions

Where does PHOENIX CONSTRUCTION CO INC install solar?

Its installs are spread across 7 counties. The most are in San Joaquin County (30 installs), followed by Alameda County (3).

How often does PHOENIX CONSTRUCTION CO INC install batteries with solar?

4.9% of its interconnected solar installs include battery storage across all years.

How many PHOENIX CONSTRUCTION CO INC installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 41 interconnected installs with a tariff recorded (41) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.