How many solar installs has Pav Solar, Inc. done in California, and which license number is on its installs?

Pav Solar, Inc. has 306 residential solar installs interconnected in California, active in the records from 2015 through 2026 (Jul 14, 2015 to Apr 30, 2026), most of them in Kern County (298), Fresno County (3) and Tulare County (3). CSLB lists license 1022652 (PAV ENGINEERING) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications A, expires Jan 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to Pav Solar, Inc. here carry more than one CSLB license number: 1022652 on 178 (CSLB holder PAV ENGINEERING, Bakersfield) and 719733 on 128 (CSLB holder PAVLETICH ELECTRIC AND COMMUNICATIONS INC, Bakersfield), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
306
Last 24 months
35
Total capacity
2,617.5 kW DC
Median system size
8 kW DC
With battery storage
0.3% all time; 2.9% last 24 months
Third-party owned
0.3% of 306 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
31 installs, latest Apr 30, 2026
Ownership types recorded
lease 1
First install
Jul 14, 2015
Latest install
Apr 30, 2026
Counties
4
Utilities
PGE 298, SCE 8
CSLB license
1022652, 719733

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
2015360
2016870
2017650
2018500
2019310
202000
202110
202200
202310
202400
2025190
2026 (through Aug 31, 2026)161

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

31 of its 306 interconnected installs (10.1% of the 306 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Apr 30, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.012641.2%not counted
NEM 2.014948.7%1 (0.7%)
Net Billing Tariff3110.1%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of Pav Solar, Inc.’s installs the utility recorded a third-party ownership type: PPA 0, lease 1, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Pav Solar, Inc. exactly.

Third-party owner named on its installsInstalls
SunPower1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 35 of Pav Solar, Inc.’s 35 installs name a module maker in the “Generator Manufacturer” fields, and most of those (25, 71.4%) used modules recorded as Hyundai.

In the last 24 months, 35 of Pav Solar, Inc.’s 35 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (34, 97.1%) used inverters recorded as Enphase.

In the last 24 months, 1 of Pav Solar, Inc.’s 35 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as Enphase.

1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHyundai2530
Qcells7not in top list
SunPower2102
JA Solar1not in top list
Waaree1not in top list
Inverter makerEnphase3462
SolarEdge152
Tesla1not in top list
Battery makerEnphase11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 303 of 306 installs, inverters on 306. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1022652PAV ENGINEERING (Corporation)CLEARA General Engineering ContractorJan 18, 2017Jan 31, 2027178
719733PAVLETICH ELECTRIC AND COMMUNICATIONS INC (Corporation)CLEARA General Engineering Contractor; B General Building Contractor; C-7; C-10 Electrical ContractorMar 6, 1996Mar 31, 2028128

License numbers are the ones the utilities recorded on the interconnection applications (306 of 306 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for licenses 1022652, 719733. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Kern298
Fresno3
Tulare3
San Luis Obispo2

Top cities

CityInstalls
Bakersfield287
Tehachapi5
Shafter4
Visalia3
Clovis2
Fresno1
Paso Robles1
Taft1
Templeton1
Wasco1

Names as recorded by the utilities

The utilities recorded this installer under 13 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
PAV SOLAR92
Pav Solar, Inc.89
Pav Solar64
Pav Solar Inc.26
Pav Solar Inc10
pav solar6
PAV SOLAR INC6
PAV Solar4
pav solar inc3
Pav-Solar Inc.3
Pav Solar inc1
PAV Solar, Inc.1
PAV-SOLAR INC1

Common questions

Where does Pav Solar, Inc. install solar?

Its installs are spread across 4 counties. The most are in Kern County (298 installs), followed by Fresno County (3).

How often does Pav Solar, Inc. install batteries with solar?

0.3% of its interconnected solar installs include battery storage across all years, and 2.9% in the last 24 months (1 of 35).

How many Pav Solar, Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

31 of its 306 interconnected installs (10.1% of the 306 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.