PAV ENGINEERING

How many solar installs has PAV ENGINEERING done in California, and which license number is on its installs?

PAV ENGINEERING has 161 residential solar installs interconnected in California, active in the records from 2021 through 2026 (Mar 10, 2021 to Apr 27, 2026), most of them in Kern County (157), San Luis Obispo County (2) and Placer County (1). CSLB lists license 1022652 (PAV ENGINEERING) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications A, expires Jan 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
161
Last 24 months
160
Total capacity
554.9 kW DC
Median system size
2.4 kW DC
With battery storage
2.5% all time; 2.5% last 24 months
Third-party owned
0.0% of 161 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
136 installs, latest Apr 27, 2026
Ownership types recorded
none recorded
Median battery size
10 kWh (1 installs list a capacity)
First install
Mar 10, 2021
Latest install
Apr 27, 2026
Counties
4
Utilities
SCE 115, PGE 46
CSLB license
1022652

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
202110
202200
202300
202430
20251214
2026 (through Aug 31, 2026)360

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

136 of its 161 interconnected installs (84.5% of the 161 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 2.9% of those include battery storage. The latest Net Billing Tariff install was approved Apr 27, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.02515.5%0 (0.0%)
Net Billing Tariff13684.5%4 (2.9%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on PAV ENGINEERING’s installs. No residential system in the file lists a third-party owner name that matches PAV ENGINEERING exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 160 of PAV ENGINEERING’s 160 installs name a module maker in the “Generator Manufacturer” fields, and most of those (129, 80.6%) used modules recorded as Qcells.

In the last 24 months, 160 of PAV ENGINEERING’s 160 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (160, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 4 of PAV ENGINEERING’s 160 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (4, 100.0%) used batteries recorded as Enphase.

4 of 4 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells129129
SunPower2425
Waaree55
Axitec11
Canadian Solar11
Inverter makerEnphase160160
Battery makerEnphase44

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 161 of 161 installs, inverters on 161. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1022652PAV ENGINEERING (Corporation)CLEARA General Engineering ContractorJan 18, 2017Jan 31, 2027161

License numbers are the ones the utilities recorded on the interconnection applications (161 of 161 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1022652. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Kern157
San Luis Obispo2
Placer1
Ventura1

Top cities

CityInstalls
Delano114
Bakersfield41
Paso Robles1
Penryn1
Pismo Beach1
Shafter1
Ventura1
Wasco1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
PAV ENGINEERING161

Common questions

Where does PAV ENGINEERING install solar?

Its installs are spread across 4 counties. The most are in Kern County (157 installs), followed by San Luis Obispo County (2).

How often does PAV ENGINEERING install batteries with solar?

2.5% of its interconnected solar installs include battery storage across all years, and 2.5% in the last 24 months (4 of 160).

How many PAV ENGINEERING installs are under NEM 3.0 (the Net Billing Tariff)?

136 of its 161 interconnected installs (84.5% of the 161 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 2.9% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.