MEASURE THE SUN

How many solar installs has MEASURE THE SUN done in California, and which license number is on its installs?

MEASURE THE SUN has 59 residential solar installs interconnected in California, active in the records from 2021 through 2026 (Mar 31, 2021 to Aug 28, 2026), most of them in Los Angeles County (47), Orange County (11) and San Diego County (1). CSLB lists license 1060850 (MEASURE THE SUN INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Dec 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
59
Last 24 months
54
Total capacity
384 kW DC
Median system size
6.5 kW DC
With battery storage
70.7% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 75.9% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 59 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
52 installs, latest Aug 28, 2026
Ownership types recorded
none recorded
Median battery size
13.5 kWh (41 installs list a capacity)
First install
Mar 31, 2021
Latest install
Aug 28, 2026
Counties
3
Utilities
SCE 58, SDGE 1
CSLB license
1060850

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
202130
202210
202310
202400
20251918
2026 (through Aug 31, 2026)3523

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

52 of its 59 interconnected installs (88.1% of the 59 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 75.0% of those include battery storage. The latest Net Billing Tariff install was approved Aug 28, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.0711.9%2 (33.3%)
Net Billing Tariff5288.1%39 (75.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on MEASURE THE SUN’s installs. No residential system in the file lists a third-party owner name that matches MEASURE THE SUN exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 54 of MEASURE THE SUN’s 54 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (20, 37.0%) used modules recorded as Hyperion Solar.

In the last 24 months, 54 of MEASURE THE SUN’s 54 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (37, 68.5%) used inverters recorded as Tesla.

In the last 24 months, 41 of MEASURE THE SUN’s 54 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (28, 68.3%) used batteries recorded as Tesla.

41 of 41 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHyperion Solar2020
Qcells1316
Hyundai1212
REC57
HYUNDAY11
Inverter makerTesla3737
Enphase1719
SolarEdge13
Battery makerTesla2828
Enphase1212
Generac11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 59 of 59 installs, inverters on 59. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names MEASURE THE SUN as developer on 2 battery storage projects and as installer on 3 (2 name it as both), 3 projects in all with 48 kWh of storage. 1 have the status Paid, with $19,412 in current incentive allocations. Applications were received from Nov 29, 2021 to Apr 22, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid119$19,412
Cancelled229$4,063

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency119$19,4121$19,412
Large-Scale Storage119$3,1250$0
Small Residential Storage110$9380$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1060850MEASURE THE SUN INC (Corporation)CLEARC-10 Electrical Contractor; C-46 Solar ContractorNov 27, 2019Dec 31, 202759

License numbers are the ones the utilities recorded on the interconnection applications (59 of 59 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1060850. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles47
Orange11
San Diego1

Top cities

CityInstalls
Long Beach24
Garden Grove4
Lakewood4
Downey3
Torrance3
Cerritos2
Compton2
Los Alamitos2
Seal Beach2
Cypress1
Fullerton1
Hermosa Beach1
La Mirada1
Los Angeles1
Montebello1

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
MEASURE THE SUN32
MEASURE THE SUN INC26
Measure The Sun1

Common questions

Where does MEASURE THE SUN install solar?

Its installs are spread across 3 counties. The most are in Los Angeles County (47 installs), followed by Orange County (11).

How often does MEASURE THE SUN install batteries with solar?

70.7% of its interconnected solar installs include battery storage across all years, and 75.9% in the last 24 months (41 of 54). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many MEASURE THE SUN installs are under NEM 3.0 (the Net Billing Tariff)?

52 of its 59 interconnected installs (88.1% of the 59 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 75.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.