Maggetti Construction

How many solar installs has Maggetti Construction done in California, and which license number is on its installs?

Maggetti Construction has 41 residential solar installs interconnected in California, active in the records from 2010 through 2012 (Jan 28, 2010 to Apr 5, 2012), most of them in Santa Clara County (29), San Mateo County (9) and Alameda County (2). The utilities did not record a CSLB license number on enough of these installs to look one up.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
41
Last 24 months
0
Total capacity
228.5 kW DC
Median system size
4.8 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 41 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Jan 28, 2010
Latest install
Apr 5, 2012
Counties
4
Utilities
PGE 41
CSLB license
none reported

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
2010100
2011230
201280
201300
201400
201500
201600
201700
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 41 interconnected installs with a tariff recorded (41) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.041100.0%not counted
NEM 2.000.0%0
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Maggetti Construction’s installs. No residential system in the file lists a third-party owner name that matches Maggetti Construction exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 41 of Maggetti Construction’s 41 installs name a module maker in the “Generator Manufacturer” fields, and most of those (37, 90.2%) used modules recorded as SunPower.

Across all years, 41 of Maggetti Construction’s 41 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (32, 78.0%) used inverters recorded as SunPower.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower037
Canadian Solar01
Kyocera01
Sharp01
Solar Semiconductor01
Inverter makerSunPower032
Enphase07
SMA02
Fronius01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 41 of 41 installs, inverters on 41. See the methodology and the equipment index.

Contractor license

The utilities did not record a license number for enough of these installs to look one up.

License numbers are the ones the utilities recorded on the interconnection applications (0 of 41 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it.

Counties

CountyInstalls
Santa Clara29
San Mateo9
Alameda2
Sonoma1

Top cities

CityInstalls
San Jose19
San Carlos5
Los Gatos4
Saratoga4
Hillsborough2
Livermore2
Gilroy1
Los Altos Hills1
Menlo Park1
San Mateo1
Sonoma1

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Maggetti Construction37
Maggetti Construction, Inc2
Maggetti Construction Inc1
Maggetti Construction, Inc.1

Common questions

Where does Maggetti Construction install solar?

Its installs are spread across 4 counties. The most are in Santa Clara County (29 installs), followed by San Mateo County (9).

How often does Maggetti Construction install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Maggetti Construction installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 41 interconnected installs with a tariff recorded (41) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.