HARRISON ELECTRIC SOLAR

How many solar installs has HARRISON ELECTRIC SOLAR done in California, and which license number is on its installs?

HARRISON ELECTRIC SOLAR has 35 residential solar installs interconnected in California, active in the records from 2021 through 2026 (Mar 17, 2021 to Jun 29, 2026), most of them in Los Angeles County (31) and Orange County (4). CSLB lists license 990803 (HARRISON ELECTRIC SOLAR) with status Contr Bond Susp in the License Master file pulled Nov 4, 2026, classifications C-10, expires Feb 29, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
35
Last 24 months
2
Total capacity
253.7 kW DC
Median system size
7.2 kW DC
With battery storage
37.1% all time; 100.0% last 24 months
Third-party owned
0.0% of 35 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
7 installs, latest Jun 29, 2026
Ownership types recorded
none recorded
Median battery size
14 kWh (13 installs list a capacity)
First install
Mar 17, 2021
Latest install
Jun 29, 2026
Counties
2
Utilities
SCE 35
CSLB license
990803

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
202162
202262
2023184
202433
202500
2026 (through Aug 31, 2026)22

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

7 of its 35 interconnected installs (20.0% of the 35 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 85.7% of those include battery storage. The latest Net Billing Tariff install was approved Jun 29, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.02880.0%7 (25.0%)
Net Billing Tariff720.0%6 (85.7%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on HARRISON ELECTRIC SOLAR’s installs. No residential system in the file lists a third-party owner name that matches HARRISON ELECTRIC SOLAR exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 2 of HARRISON ELECTRIC SOLAR’s 2 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (1, 50.0%) used modules recorded as Hyundai.

In the last 24 months, 2 of HARRISON ELECTRIC SOLAR’s 2 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (2, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 2 of HARRISON ELECTRIC SOLAR’s 2 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (2, 100.0%) used batteries recorded as FranklinWH.

11 of 13 battery-paired PG&E and SCE installs (84.6%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHyundai1not in top list
JA Solar1not in top list
Inverter makerEnphase212
Battery makerFranklinWH26

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 35 of 35 installs, inverters on 35. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
990803HARRISON ELECTRIC SOLAR (Corporation)Contr Bond SuspC-10 Electrical ContractorFeb 21, 2014Feb 29, 202835

License numbers are the ones the utilities recorded on the interconnection applications (35 of 35 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 990803. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles31
Orange4

Top cities

CityInstalls
Whittier23
Orange2
Arcadia1
Hacienda Heights1
Hawthorne1
La Habra1
La Mirada1
Long Beach1
Monrovia1
Placentia1
Santa Fe Springs1
West Covina1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
HARRISON ELECTRIC SOLAR35

Common questions

Where does HARRISON ELECTRIC SOLAR install solar?

Its installs are spread across 2 counties. The most are in Los Angeles County (31 installs), followed by Orange County (4).

How often does HARRISON ELECTRIC SOLAR install batteries with solar?

37.1% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (2 of 2).

How many HARRISON ELECTRIC SOLAR installs are under NEM 3.0 (the Net Billing Tariff)?

7 of its 35 interconnected installs (20.0% of the 35 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 85.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.