GILES CONSTRUCTION

How many solar installs has GILES CONSTRUCTION done in California, and which license number is on its installs?

GILES CONSTRUCTION has 236 residential solar installs interconnected in California, active in the records from 2014 through 2026 (Sep 23, 2014 to Aug 3, 2026), most of them in San Bernardino County (232), Riverside County (2) and Kern County (1). CSLB lists license 682064 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-20, expires Dec 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
236
Last 24 months
56
Total capacity
1,023.5 kW DC
Median system size
3.3 kW DC
With battery storage
0.0% all time; 0.0% last 24 months
Third-party owned
0.0% of 235 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
87 installs, latest Aug 3, 2026
Ownership types recorded
none recorded
First install
Sep 23, 2014
Latest install
Aug 3, 2026
Counties
4
Utilities
SCE 236
CSLB license
682064

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
201410
201510
201600
201700
201830
201910
202030
2021360
2022760
2023290
2024400
2025240
2026 (through Aug 31, 2026)220

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

87 of its 236 interconnected installs (36.9% of the 236 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Aug 3, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.020.8%not counted
NEM 2.014762.3%0 (0.0%)
Net Billing Tariff8736.9%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on GILES CONSTRUCTION’s installs. No residential system in the file lists a third-party owner name that matches GILES CONSTRUCTION exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 56 of GILES CONSTRUCTION’s 56 installs name a module maker in the “Generator Manufacturer” fields, and most of those (34, 60.7%) used modules recorded as Mission Solar.

In the last 24 months, 56 of GILES CONSTRUCTION’s 56 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (56, 100.0%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerMission Solar3446
Qcells2260
Inverter makerEnphase56140

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 227 of 236 installs, inverters on 236. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
682064Sole owner license (name not shown)CLEARB General Building Contractor; C-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning ContractorDec 14, 1993Dec 31, 2027236

License numbers are the ones the utilities recorded on the interconnection applications (236 of 236 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 682064. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
San Bernardino232
Riverside2
Kern1
Los Angeles1

Top cities

CityInstalls
Hesperia98
Apple Valley69
Victorville19
Oak Hills12
Phelan12
Lucerne Valley11
Pinon Hills4
Helendale2
Yermo2
California City1
El Mirage1
Norco1
Palmdale1
Rancho Cucamonga1
Riverside1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
GILES CONSTRUCTION234
Giles Construction2

Common questions

Where does GILES CONSTRUCTION install solar?

Its installs are spread across 4 counties. The most are in San Bernardino County (232 installs), followed by Riverside County (2).

How often does GILES CONSTRUCTION install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 56).

How many GILES CONSTRUCTION installs are under NEM 3.0 (the Net Billing Tariff)?

87 of its 236 interconnected installs (36.9% of the 236 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.