Fisher Electric

How many solar installs has Fisher Electric done in California, and which license number is on its installs?

Fisher Electric has 44 residential solar installs interconnected in California, active in the records from 2013 through 2026 (Sep 14, 2013 to Apr 15, 2026), most of them in Santa Cruz County (26), Santa Clara County (8) and Monterey County (3). CSLB lists license 631964 (FISHER ELECTRIC INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Apr 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
44
Last 24 months
8
Total capacity
316.6 kW DC
Median system size
7.2 kW DC
With battery storage
15.9% all time; 87.5% last 24 months
Third-party owned
0.0% of 43 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
12 installs, latest Apr 15, 2026
Ownership types recorded
none recorded
Median battery size
14.3 kWh (5 installs list a capacity)
First install
Sep 14, 2013
Latest install
Apr 15, 2026
Counties
9
Utilities
PGE 42, SCE 2
CSLB license
631964

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2013 to 2026

YearInstalls interconnectedWith battery storage
201320
201410
201530
201640
201730
201800
201910
202020
202140
202280
202350
202430
202532
2026 (through Aug 31, 2026)55

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

12 of its 44 interconnected installs (27.3% of the 44 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 58.3% of those include battery storage. The latest Net Billing Tariff install was approved Apr 15, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.01022.7%not counted
NEM 2.02250.0%0 (0.0%)
Net Billing Tariff1227.3%7 (58.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Fisher Electric’s installs. No residential system in the file lists a third-party owner name that matches Fisher Electric exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 8 of Fisher Electric’s 8 installs name a module maker in the “Generator Manufacturer” fields, and most of those (5, 62.5%) used modules recorded as REC.

In the last 24 months, 8 of Fisher Electric’s 8 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (6, 75.0%) used inverters recorded as Tesla.

In the last 24 months, 4 of Fisher Electric’s 8 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (4, 100.0%) used batteries recorded as Tesla.

4 of 7 battery-paired PG&E and SCE installs (57.1%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC519
Hyundai22
Alexus Solar1not in top list
EG41not in top list
Inverter makerTesla66
EG411
SolarEdge131
Battery makerTesla44

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 43 of 44 installs, inverters on 44. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Fisher Electric as developer on 6 battery storage projects and as installer on 5 (5 name it as both), 6 projects in all with 174 kWh of storage. 1 have the status Paid, with $9,900 in current incentive allocations. Applications were received from Nov 25, 2023 to Apr 10, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid140$9,900
Cancelled5134$27,601

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Large-Scale Storage3119$29,7001$9,900
Small Residential Storage355$7,8010$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
631964FISHER ELECTRIC INC (Corporation)CLEARC-10 Electrical Contractor; C-46 Solar ContractorNov 14, 1991Apr 30, 202840

License numbers are the ones the utilities recorded on the interconnection applications (41 of 44 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 631964. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Santa Cruz26
Santa Clara8
Monterey3
Kings2
Alameda1
Kern1
Nevada1
San Joaquin1
San Mateo1

Top cities

CityInstalls
Santa Cruz9
San Jose5
Ben Lomond4
Boulder Creek3
Scotts Valley3
Aptos2
Hanford2
Los Gatos2
Pacific Grove2
Watsonville2
Bakersfield1
Carmel1
Felton1
Los Altos1
Oakland1

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
FISHER ELECTRIC INC32
Fisher Electric9
Fisher Electric Inc1
Fisher Electric, Inc1
Fisher Electric, Inc.1

Common questions

Where does Fisher Electric install solar?

Its installs are spread across 9 counties. The most are in Santa Cruz County (26 installs), followed by Santa Clara County (8).

How often does Fisher Electric install batteries with solar?

15.9% of its interconnected solar installs include battery storage across all years, and 87.5% in the last 24 months (7 of 8).

How many Fisher Electric installs are under NEM 3.0 (the Net Billing Tariff)?

12 of its 44 interconnected installs (27.3% of the 44 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 58.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.