ENCHARGE ENERGY

How many solar installs has ENCHARGE ENERGY done in California, and which license number is on its installs?

ENCHARGE ENERGY has 245 residential solar installs interconnected in California, active in the records from 2024 through 2026 (Oct 31, 2024 to Aug 27, 2026), most of them in Kern County (218), Tulare County (14) and Fresno County (6). CSLB lists license 1103108 (ENCHARGE ENERGY) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Oct 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
245
Last 24 months
245
Total capacity
1,507.1 kW DC
Median system size
4.2 kW DC
With battery storage
49.8% all time; 49.8% last 24 months
Third-party owned
0.0% of 245 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
140 installs, latest Aug 14, 2026
Ownership types recorded
none recorded
Median battery size
11.8 kWh (12 installs list a capacity)
First install
Oct 31, 2024
Latest install
Aug 27, 2026
Counties
6
Utilities
PGE 223, SCE 22
CSLB license
1103108

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2024 to 2026

YearInstalls interconnectedWith battery storage
20241811
202517492
2026 (through Aug 31, 2026)5319

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

140 of its 245 interconnected installs (57.1% of the 245 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 78.6% of those include battery storage. The latest Net Billing Tariff install was approved Aug 14, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.010542.9%12 (11.4%)
Net Billing Tariff14057.1%110 (78.6%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on ENCHARGE ENERGY’s installs. No residential system in the file lists a third-party owner name that matches ENCHARGE ENERGY exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 237 of ENCHARGE ENERGY’s 245 installs name a module maker in the “Generator Manufacturer” fields, and most of those (202, 85.2%) used modules recorded as Znshine.

In the last 24 months, 245 of ENCHARGE ENERGY’s 245 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (238, 97.1%) used inverters recorded as Enphase.

In the last 24 months, 116 of ENCHARGE ENERGY’s 245 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (106, 91.4%) used batteries recorded as Enphase.

115 of 122 battery-paired PG&E and SCE installs (94.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerZnshine202202
Qcells2222
Aptos Solar44
Canadian Solar44
VSUN (Vietnam Sunergy)44
Inverter makerEnphase238238
Tesla1111
SolarEdge55
Fronius22
Delta Electronics11
Battery makerEnphase106106
Tesla1010

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 237 of 245 installs, inverters on 245. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1103108ENCHARGE ENERGY (Corporation)CLEARC-10 Electrical Contractor; C-46 Solar ContractorMar 29, 2023Oct 31, 2028245

License numbers are the ones the utilities recorded on the interconnection applications (245 of 245 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1103108. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Kern218
Tulare14
Fresno6
Solano4
Kings2
San Luis Obispo1

Top cities

CityInstalls
Bakersfield165
Arvin29
Shafter5
Delano4
Lamont4
Wasco4
Buttonwillow3
Visalia3
Armona2
Exeter2
Fresno2
Porterville2
Suisun City2
Tehachapi2
Terra Bella2

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ENCHARGE ENERGY245

Common questions

Where does ENCHARGE ENERGY install solar?

Its installs are spread across 6 counties. The most are in Kern County (218 installs), followed by Tulare County (14).

How often does ENCHARGE ENERGY install batteries with solar?

49.8% of its interconnected solar installs include battery storage across all years, and 49.8% in the last 24 months (122 of 245).

How many ENCHARGE ENERGY installs are under NEM 3.0 (the Net Billing Tariff)?

140 of its 245 interconnected installs (57.1% of the 245 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 78.6% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.