CODELLA SOLAR & ASSOCIATES

How many solar installs has CODELLA SOLAR & ASSOCIATES done in California, and which license number is on its installs?

CODELLA SOLAR & ASSOCIATES has 87 residential solar installs interconnected in California, active in the records from 2009 through 2026 (Feb 23, 2009 to Jun 15, 2026), most of them in Ventura County (82), Santa Barbara County (3) and Los Angeles County (2). CSLB lists license 809435 (CODELLA SOLAR & ASSOCIATES) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-46, expires Aug 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
87
Last 24 months
9
Total capacity
472 kW DC
Median system size
5.4 kW DC
With battery storage
11.5% all time; 55.6% last 24 months
Third-party owned
1.1% of 87 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
12 installs, latest Jun 15, 2026
Ownership types recorded
PPA 1
Median battery size
12.1 kWh (10 installs list a capacity)
First install
Feb 23, 2009
Latest install
Jun 15, 2026
Counties
3
Utilities
SCE 87
CSLB license
809435

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2009 to 2026

YearInstalls interconnectedWith battery storage
200930
201020
201110
201200
201300
201400
201520
201620
201720
201870
201940
2020111
2021171
2022101
2023110
202484
202542
2026 (through Aug 31, 2026)31

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

12 of its 87 interconnected installs (13.8% of the 87 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 58.3% of those include battery storage. The latest Net Billing Tariff install was approved Jun 15, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.01213.8%not counted
NEM 2.06372.4%3 (4.8%)
Net Billing Tariff1213.8%7 (58.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of CODELLA SOLAR & ASSOCIATES’s installs the utility recorded a third-party ownership type: PPA 1, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches CODELLA SOLAR & ASSOCIATES exactly.

Third-party owner named on its installsInstalls
Codella Solar & Assoc. Inc.1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 7 of CODELLA SOLAR & ASSOCIATES’ 9 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (3, 42.9%) used modules recorded as Qcells.

In the last 24 months, 9 of CODELLA SOLAR & ASSOCIATES’ 9 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (9, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 5 of CODELLA SOLAR & ASSOCIATES’ 9 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (4, 80.0%) used batteries recorded as Enphase.

9 of 10 battery-paired PG&E and SCE installs (90.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells330
JinkoSolar2not in top list
JA Solar1not in top list
Solaria115
Inverter makerEnphase945
Battery makerEnphase46
FranklinWH11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 77 of 87 installs, inverters on 87. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
809435CODELLA SOLAR & ASSOCIATES (Corporation)CLEARC-46 Solar ContractorJun 13, 2002Aug 31, 202887

License numbers are the ones the utilities recorded on the interconnection applications (87 of 87 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 809435. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Ventura82
Santa Barbara3
Los Angeles2

Top cities

CityInstalls
Ventura33
Camarillo12
Oxnard8
Ojai6
Santa Paula6
Oak View5
Thousand Oaks5
Newbury Park4
Agoura Hills2
Fillmore2
Santa Barbara2
Goleta1
Simi Valley1

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
CODELLA SOLAR & ASSOCIATES74
Codella Solar & Associates Inc.6
Codella Solar & Associates, Inc4
Codella Solar & Associates, Inc.2
Codella Solar & Associates1

Common questions

Where does CODELLA SOLAR & ASSOCIATES install solar?

Its installs are spread across 3 counties. The most are in Ventura County (82 installs), followed by Santa Barbara County (3).

How often does CODELLA SOLAR & ASSOCIATES install batteries with solar?

11.5% of its interconnected solar installs include battery storage across all years, and 55.6% in the last 24 months (5 of 9).

How many CODELLA SOLAR & ASSOCIATES installs are under NEM 3.0 (the Net Billing Tariff)?

12 of its 87 interconnected installs (13.8% of the 87 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 58.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.