Blue Sky Energy

How many solar installs has Blue Sky Energy done in California, and which license number is on its installs?

Blue Sky Energy has 39 residential solar installs interconnected in California, active in the records from 2014 through 2026 (Jul 26, 2014 to Aug 12, 2026), most of them in Los Angeles County (37), San Bernardino County (1) and Tulare County (1). CSLB lists license 632049 (BLUE SKY ENERGY) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications ASB, B, C-10, C-46, expires Nov 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
39
Last 24 months
20
Total capacity
335.3 kW DC
Median system size
7.2 kW DC
With battery storage
43.6% all time; 50.0% last 24 months
Third-party owned
0.0% of 38 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
16 installs, latest Aug 12, 2026
Ownership types recorded
none recorded
Median battery size
27 kWh (17 installs list a capacity)
First install
Jul 26, 2014
Latest install
Aug 12, 2026
Counties
3
Utilities
SCE 39
CSLB license
632049

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
201410
201500
201600
201700
201810
201900
202000
202120
202251
202374
202453
2025106
2026 (through Aug 31, 2026)83

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

16 of its 39 interconnected installs (41.0% of the 39 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 56.3% of those include battery storage. The latest Net Billing Tariff install was approved Aug 12, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.012.6%not counted
NEM 2.02256.4%8 (36.4%)
Net Billing Tariff1641.0%9 (56.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Blue Sky Energy’s installs. No residential system in the file lists a third-party owner name that matches Blue Sky Energy exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 20 of Blue Sky Energy’s 20 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (9, 45.0%) used modules recorded as Qcells.

In the last 24 months, 20 of Blue Sky Energy’s 20 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (13, 65.0%) used inverters recorded as Enphase.

In the last 24 months, 10 of Blue Sky Energy’s 20 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (10, 100.0%) used batteries recorded as Tesla.

17 of 17 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells915
SunPower610
REC44
SEG Solar1not in top list
Inverter makerEnphase1321
Tesla67
SunPower14
Battery makerTesla1017

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 38 of 39 installs, inverters on 39. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Blue Sky Energy as developer on 0 battery storage projects and as installer on 78 (0 name it as both), 78 projects in all with 2,622 kWh of storage. 58 have the status Paid, with $486,556 in current incentive allocations. Applications were received from Jun 17, 2019 to Dec 30, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid581,637$486,556
PBI in Process1464$116,000
Reserved8216$28,423
Pending Reservation115$3,480
Cancelled9264$74,000
RRF Rejected126$4,640

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage581,406$259,49544$211,892
Large-Scale Storage13966$224,5649$76,664
Equity Resiliency6224$224,4005$198,000
Not stated126$4,6400$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
632049BLUE SKY ENERGY (Corporation)CLEARASB; B General Building Contractor; C-10 Electrical Contractor; C-46 Solar ContractorNov 14, 1991Nov 30, 202738

License numbers are the ones the utilities recorded on the interconnection applications (38 of 39 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 632049. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Los Angeles37
San Bernardino1
Tulare1

Top cities

CityInstalls
Santa Monica17
Malibu8
Culver City3
Agoura Hills2
Beverly Hills1
Castaic1
Hidden Hills1
Joshua Tree1
La Canada1
Los Angeles1
San Marino1
Springville1
Torrance1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
BLUE SKY ENERGY30
Blue Sky Energy9

Common questions

Where does Blue Sky Energy install solar?

Its installs are spread across 3 counties. The most are in Los Angeles County (37 installs), followed by San Bernardino County (1).

How often does Blue Sky Energy install batteries with solar?

43.6% of its interconnected solar installs include battery storage across all years, and 50.0% in the last 24 months (10 of 20).

How many Blue Sky Energy installs are under NEM 3.0 (the Net Billing Tariff)?

16 of its 39 interconnected installs (41.0% of the 39 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 56.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.