How many solar installs has Alternative Power Systems done in California, and which license number is on its installs?

Alternative Power Systems has 52 residential solar installs interconnected in California, active in the records from 2002 through 2016 (Jun 18, 2002 to Dec 1, 2016), most of them in Nevada County (29), Placer County (10) and Sonoma County (7). The utilities did not record a CSLB license number on enough of these installs to look one up.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
52
Last 24 months
0
Total capacity
277.3 kW DC
Median system size
4.5 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 52 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Jun 18, 2002
Latest install
Dec 1, 2016
Counties
8
Utilities
PGE 52
CSLB license
none reported

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2002 to 2026

YearInstalls interconnectedWith battery storage
200230
200360
2004200
2005220
200600
200700
200800
200900
201000
201100
201200
201300
201400
201500
201610
201700
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 52 interconnected installs with a tariff recorded (52) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.052100.0%not counted
NEM 2.000.0%0
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Alternative Power Systems’s installs. No residential system in the file lists a third-party owner name that matches Alternative Power Systems exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 47 of Alternative Power Systems’ 52 installs name a module maker in the “Generator Manufacturer” fields, and most of those (44, 93.6%) used modules recorded as Sharp.

Across all years, 52 of Alternative Power Systems’ 52 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (44, 84.6%) used inverters recorded as SMA.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSharp044
Canadian Solar01
Evergreen Solar01
Shott Applied Power Corp.01
Inverter makerSMA044
Sharp06
Advanced Energy, Inc.01
PV Powered01
Xantrex Technology Inc.01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 47 of 52 installs, inverters on 52. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Alternative Power Systems as developer on 0 battery storage projects and as installer on 1 (0 name it as both), 1 projects in all with 10 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Oct 28, 2024 to Oct 28, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled110$1,440

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage110$1,4400$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

The utilities did not record a license number for enough of these installs to look one up.

License numbers are the ones the utilities recorded on the interconnection applications (1 of 52 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it.

Counties

CountyInstalls
Nevada29
Placer10
Sonoma7
Yuba2
Amador1
Butte1
Napa1
Tuolumne1

Top cities

CityInstalls
Grass Valley20
Sebastopol5
Rough And Ready3
Auburn2
Lincoln2
Nevada City2
Rocklin2
Smartsville2
Browns Valley1
Calistoga1
Georgetown1
Gridley1
Marysville1
Newcastle1
Penn Valley1

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Alternative Power Systems44
ALTERNATIVE POWER SYSTEMS4
Alternative Power Systems, Inc.3
Alternative Power Systems, Inc1

Common questions

Where does Alternative Power Systems install solar?

Its installs are spread across 8 counties. The most are in Nevada County (29 installs), followed by Placer County (10).

How often does Alternative Power Systems install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Alternative Power Systems installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 52 interconnected installs with a tariff recorded (52) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.