Home solar in ZIP code 93271, California

Service city recorded on most installs: Three Rivers. County: Tulare County.

How many homes in ZIP code 93271 have solar?

PG&E, SCE and SDG&E interconnected 261 residential solar systems in ZIP code 93271 through Aug 31, 2026, 63 of them in the last 24 months (Sep 2024 through Aug 2026). The utilities recorded Three Rivers, Tulare County, as the service city on 260 of them. Sunrun has the most installs recorded in this ZIP, 30.

Counts of interconnected systems from utility records, not a rating of any installer.

Data: California DG Stats interconnection records (Interconnected_Project_Sites_2026-08-31.zip), which run through Aug 31, 2026. ZIP codes are the service ZIP the utility recorded on each project.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

At a glance

Residential solar installs
261
Last 24 months
63 (Sep 2024 through Aug 2026)
Capacity
2,224.6 kW DC
Median system size
7.6 kW DC
Net Billing Tariff (NEM 3.0)
72 installs, 27.6% of those with a tariff recorded
Utility
SCE 261
First install in data
Apr 29, 2002
Latest install in data
Aug 31, 2026

Installs by year

YearInstalls interconnectedWith battery storage
200210
200300
200410
200520
200650
200760
200850
200920
201090
201120
201250
2013110
201490
2015100
201610
2017150
201842
201970
2020161
2021152
2022221
2023262
20243422
20252625
2026 (through Aug 31, 2026)2721

Battery storage

29.1% of the residential solar installs here include battery storage across all years (76 of 261). In the last 24 months the share was 82.5% (52 of 63).

Net metering tariff

Of the 261 installs with a net metering tariff recorded: NEM 1.0 77 (29.5%), NEM 2.0 112 (42.9%), the Net Billing Tariff (often called NEM 3.0) 72 (27.6%). The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Lease, PPA or owned

29.6% of the 233 installs with ownership recorded are third-party owned (a lease or power purchase agreement); the other 164 are recorded as not third-party owned. Ownership types recorded: PPA 52, lease 16, other 1.

Installers by installs in 93271

Installers with a page in this index, most installs in this ZIP first. 72 such installers have at least one install here. 23 more installs were by 18 installer names without a page in this index. 13 were self-installed or had no installer recorded. Counts of connected systems, not a rating.

InstallerInstalls in 93271Last 24 months
Sunrun3013
Tesla Energy Operations (formerly SolarCity)171
ALTSYS SOLAR INC165
Air Sun Inc142
FREEDOM FOREVER LLC92
JP ELECTRICAL SOLAR INC92
Empower Electric Solar86
Bright House Energy Construction52
Real Goods Solar50
B&D Quality Water, Inc. DBA:Quality Home40

City and county recorded for 93271

The Service City and Service County the utilities entered on this ZIP’s installs, as recorded. No outside ZIP directory is used.

Recorded asInstalls
City: Three Rivers260
County: Tulare County261

1 other city value on 1 install, each under 1% of this ZIP’s installs, are not listed.

Common questions

How common are home batteries with solar in 93271?

29.1% of the residential solar installs here include battery storage across all years (76 of 261). In the last 24 months the share was 82.5% (52 of 63).

How many solar installs in 93271 are under NEM 3.0?

72 of the 261 installs here with a tariff recorded (27.6%) were interconnected under the Net Billing Tariff, often called NEM 3.0, which applies to interconnection applications submitted on or after April 15, 2023.

Which solar installers have the most installs in 93271?

Among installers with a page in this index, by installs interconnected here through Aug 31, 2026: Sunrun (30), Tesla Energy Operations (formerly SolarCity) (17), ALTSYS SOLAR INC (16). These are counts of connected systems, not a rating of price, workmanship or service.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.