How many homes in ZIP code 92328 have solar?

PG&E, SCE and SDG&E interconnected 29 residential solar systems in ZIP code 92328 through Aug 31, 2026, 0 of them in the last 24 months (Sep 2024 through Aug 2026). The utilities recorded Death Valley, Inyo County, as the service city on 28 of them. GRID Alternatives has the most installs recorded in this ZIP, 21.

Counts of interconnected systems from utility records, not a rating of any installer.

Data: California DG Stats interconnection records (Interconnected_Project_Sites_2026-08-31.zip), which run through Aug 31, 2026. ZIP codes are the service ZIP the utility recorded on each project.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

At a glance

Residential solar installs
29
Last 24 months
0 (Sep 2024 through Aug 2026)
Capacity
106.8 kW DC
Median system size
3.2 kW DC
Net Billing Tariff (NEM 3.0)
0 installs, 0.0% of those with a tariff recorded
Utility
SCE 29
First install in data
Feb 23, 2012
Latest install in data
Jul 12, 2022

Installs by year

YearInstalls interconnectedWith battery storage
201270
201300
201400
201500
2016120
201700
201800
201900
202040
202110
202250
202300
202400
202500
2026 (through Aug 31, 2026)00

Battery storage

0.0% of the residential solar installs here include battery storage across all years (0 of 29). There were no PG&E or SCE installs here in the last 24 months.

Net metering tariff

Of the 29 installs with a net metering tariff recorded: NEM 1.0 19 (65.5%), NEM 2.0 10 (34.5%), the Net Billing Tariff (often called NEM 3.0) 0 (0.0%). The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Lease, PPA or owned

0.0% of the 22 installs with ownership recorded are third-party owned (a lease or power purchase agreement); the other 22 are recorded as not third-party owned.

Installers by installs in 92328

Installers with a page in this index, most installs in this ZIP first. 2 such installers have at least one install here. 7 more installs were by 1 installer names without a page in this index. Counts of connected systems, not a rating.

InstallerInstalls in 92328Last 24 months
GRID Alternatives210
FREEVOLT U S A INC10

City and county recorded for 92328

The Service City and Service County the utilities entered on this ZIP’s installs, as recorded. No outside ZIP directory is used.

Recorded asInstalls
City: Death Valley28
City: Yermo1
County: Inyo County28
County: San Bernardino County1

Common questions

How common are home batteries with solar in 92328?

0.0% of the residential solar installs here include battery storage across all years (0 of 29). There were no PG&E or SCE installs here in the last 24 months.

How many solar installs in 92328 are under NEM 3.0?

0 of the 29 installs here with a tariff recorded (0.0%) were interconnected under the Net Billing Tariff, often called NEM 3.0, which applies to interconnection applications submitted on or after April 15, 2023.

Which solar installers have the most installs in 92328?

Among installers with a page in this index, by installs interconnected here through Aug 31, 2026: GRID Alternatives (21), FREEVOLT U S A INC (1). These are counts of connected systems, not a rating of price, workmanship or service.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.