TOMSIK GREG CONSTRUCTION

How many solar installs has TOMSIK GREG CONSTRUCTION done in California, and which license number is on its installs?

TOMSIK GREG CONSTRUCTION has 206 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Oct 14, 2019 to Aug 26, 2026), most of them in Shasta County (183), Tehama County (21) and Butte County (1). CSLB lists license 586698 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Jan 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
206
Last 24 months
20
Total capacity
1,995.8 kW DC
Median system size
9.2 kW DC
With battery storage
12.6% all time; 50.0% last 24 months
Third-party owned
0.0% of 206 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
29 installs, latest Aug 26, 2026
Ownership types recorded
none recorded
Median battery size
20 kWh (24 installs list a capacity)
First install
Oct 14, 2019
Latest install
Aug 26, 2026
Counties
4
Utilities
PGE 206
CSLB license
586698

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
2019100
2020242
2021282
2022497
2023565
2024230
2025116
2026 (through Aug 31, 2026)54

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

29 of its 206 interconnected installs (14.1% of the 206 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 34.5% of those include battery storage. The latest Net Billing Tariff install was approved Aug 26, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.017785.9%16 (9.0%)
Net Billing Tariff2914.1%10 (34.5%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on TOMSIK GREG CONSTRUCTION’s installs. No residential system in the file lists a third-party owner name that matches TOMSIK GREG CONSTRUCTION exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 20 of TOMSIK GREG CONSTRUCTION’s 20 installs name a module maker in the “Generator Manufacturer” fields, and most of those (18, 90.0%) used modules recorded as Auxin Solar.

In the last 24 months, 20 of TOMSIK GREG CONSTRUCTION’s 20 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (10, 50.0%) used inverters recorded as Sol-Ark.

In the last 24 months, none of TOMSIK GREG CONSTRUCTION’s 20 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

8 of 26 battery-paired PG&E and SCE installs (30.8%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerAuxin Solar18123
Advance Power442
API, Inc47
EG42not in top list
Hyperion Solar1not in top list
Inverter makerSol-Ark1043
Enphase9124
EG41not in top list
Battery makerUFO Power Technology Co., Ltd.08

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 201 of 206 installs, inverters on 206. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
586698Sole owner license (name not shown)CLEARB General Building ContractorJan 24, 1990Jan 31, 2028206

License numbers are the ones the utilities recorded on the interconnection applications (206 of 206 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 586698. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Shasta183
Tehama21
Butte1
Plumas1

Top cities

CityInstalls
Redding54
Anderson46
Cottonwood33
Palo Cedro30
Millville8
Red Bluff8
Bella Vista3
Oak Run3
Shingletown3
Burney2
Los Molinos2
Shasta2
Whitmore2
Bangor1
Corning1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
TOMSIK GREG CONSTRUCTION206

Common questions

Where does TOMSIK GREG CONSTRUCTION install solar?

Its installs are spread across 4 counties. The most are in Shasta County (183 installs), followed by Tehama County (21).

How often does TOMSIK GREG CONSTRUCTION install batteries with solar?

12.6% of its interconnected solar installs include battery storage across all years, and 50.0% in the last 24 months (10 of 20).

How many TOMSIK GREG CONSTRUCTION installs are under NEM 3.0 (the Net Billing Tariff)?

29 of its 206 interconnected installs (14.1% of the 206 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 34.5% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.