StarPower Systems, Inc.

How many solar installs has StarPower Systems, Inc. done in California, and which license number is on its installs?

StarPower Systems, Inc. has 60 residential solar installs interconnected in California, active in the records from 2023 through 2026 (Mar 23, 2023 to Apr 16, 2026), most of them in Santa Clara County (48) and Santa Cruz County (12). CSLB lists license 1102359 (STARPOWER SYSTEMS INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Mar 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
60
Last 24 months
17
Total capacity
417.5 kW DC
Median system size
7 kW DC
With battery storage
28.3% all time; 47.1% last 24 months
Third-party owned
0.0% of 60 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
12 installs, latest Apr 16, 2026
Ownership types recorded
none recorded
Median battery size
16 kWh (9 installs list a capacity)
First install
Mar 23, 2023
Latest install
Apr 16, 2026
Counties
2
Utilities
PGE 60
CSLB license
1102359

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2023 to 2026

YearInstalls interconnectedWith battery storage
2023315
2024144
202596
2026 (through Aug 31, 2026)62

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

12 of its 60 interconnected installs (20.0% of the 60 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 58.3% of those include battery storage. The latest Net Billing Tariff install was approved Apr 16, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.011.7%not counted
NEM 2.04778.3%9 (19.1%)
Net Billing Tariff1220.0%7 (58.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on StarPower Systems, Inc.’s installs. No residential system in the file lists a third-party owner name that matches StarPower Systems, Inc. exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 15 of StarPower Systems, Inc.’s 17 installs name a module maker in the “Generator Manufacturer” fields, and most of those (8, 53.3%) used modules recorded as REC.

In the last 24 months, 17 of StarPower Systems, Inc.’s 17 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (10, 58.8%) used inverters recorded as Enphase.

In the last 24 months, 6 of StarPower Systems, Inc.’s 17 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (3, 50.0%) used batteries recorded as Tesla.

14 of 17 battery-paired PG&E and SCE installs (82.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC843
Hyundai55
Astro Power, Inc11
LG11
Silfab1not in top list
Inverter makerEnphase1030
Tesla67
SolarEdge225
Xantrex Technology Inc.22
SunPower12
Battery makerTesla33
Enphase22
LG19

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 53 of 60 installs, inverters on 60. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names StarPower Systems, Inc. as developer on 2 battery storage projects and as installer on 2 (2 name it as both), 2 projects in all with 19 kWh of storage. 2 have the status Paid, with $2,851 in current incentive allocations. Applications were received from Nov 16, 2021 to Nov 16, 2021.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid219$2,851

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage219$2,8512$2,851

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1102359STARPOWER SYSTEMS INC (Corporation)CLEARC-10 Electrical ContractorMar 10, 2023Mar 31, 202758

License numbers are the ones the utilities recorded on the interconnection applications (58 of 60 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1102359. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Santa Clara48
Santa Cruz12

Top cities

CityInstalls
San Jose24
Sunnyvale7
Campbell5
Santa Cruz5
Los Gatos3
Saratoga3
Boulder Creek2
Felton2
Mountain View2
Scotts Valley2
Aptos1
Cupertino1
Gilroy1
Los Altos1
Los Altos Hills1

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
STARPOWER SYSTEMS INC41
StarPower Systems, Inc.13
StarPower Systems6

Common questions

Where does StarPower Systems, Inc. install solar?

Its installs are spread across 2 counties. The most are in Santa Clara County (48 installs), followed by Santa Cruz County (12).

How often does StarPower Systems, Inc. install batteries with solar?

28.3% of its interconnected solar installs include battery storage across all years, and 47.1% in the last 24 months (8 of 17).

How many StarPower Systems, Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

12 of its 60 interconnected installs (20.0% of the 60 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 58.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.