How many solar installs has Solcon Solar Construction done in California, and which license number is on its installs?

Solcon Solar Construction has 85 residential solar installs interconnected in California, active in the records from 2005 through 2026 (Sep 30, 2005 to Aug 17, 2026), most of them in Santa Cruz County (65), Santa Clara County (9) and San Mateo County (6). CSLB lists license 584607 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-46, expires Jan 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
85
Last 24 months
16
Total capacity
410.8 kW DC
Median system size
4.4 kW DC
With battery storage
8.2% all time; 31.3% last 24 months
Third-party owned
0.0% of 85 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
16 installs, latest Aug 17, 2026
Ownership types recorded
none recorded
Median battery size
15 kWh (1 installs list a capacity)
First install
Sep 30, 2005
Latest install
Aug 17, 2026
Counties
6
Utilities
PGE 83, SCE 2
CSLB license
584607

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2005 to 2026

YearInstalls interconnectedWith battery storage
200520
200650
200720
200860
200920
201020
201160
201200
201300
201400
201500
201600
201700
201800
201930
202070
202140
202241
2023190
2024103
202581
2026 (through Aug 31, 2026)52

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

16 of its 85 interconnected installs (18.8% of the 85 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 31.3% of those include battery storage. The latest Net Billing Tariff install was approved Aug 17, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.02529.4%not counted
NEM 2.04451.8%2 (4.5%)
Net Billing Tariff1618.8%5 (31.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Solcon Solar Construction’s installs. No residential system in the file lists a third-party owner name that matches Solcon Solar Construction exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 16 of Solcon Solar Construction’s 16 installs name a module maker in the “Generator Manufacturer” fields, and most of those (11, 68.8%) used modules recorded as REC.

In the last 24 months, 16 of Solcon Solar Construction’s 16 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (16, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 5 of Solcon Solar Construction’s 16 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (5, 100.0%) used batteries recorded as Enphase.

7 of 7 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC1120
Hyundai2not in top list
Canadian Solar1not in top list
LG18
Qcells115
Inverter makerEnphase1657
Battery makerEnphase56

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 83 of 85 installs, inverters on 85. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
584607Sole owner license (name not shown)CLEARB General Building Contractor; C-46 Solar ContractorJan 6, 1990Jan 31, 202860

License numbers are the ones the utilities recorded on the interconnection applications (60 of 85 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 584607. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Santa Cruz65
Santa Clara9
San Mateo6
Los Angeles2
Monterey2
San Benito1

Top cities

CityInstalls
Santa Cruz40
Aptos7
Gilroy7
Soquel7
Capitola5
Watsonville4
Hermosa Beach2
Aromas1
Belmont1
Boulder Creek1
Burlingame1
Carmel Valley1
Hollister1
La Selva Beach1
Los Altos1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SOLCON SOLAR CONSTRUCTION60
Solcon Solar Construction25

Common questions

Where does Solcon Solar Construction install solar?

Its installs are spread across 6 counties. The most are in Santa Cruz County (65 installs), followed by Santa Clara County (9).

How often does Solcon Solar Construction install batteries with solar?

8.2% of its interconnected solar installs include battery storage across all years, and 31.3% in the last 24 months (5 of 16).

How many Solcon Solar Construction installs are under NEM 3.0 (the Net Billing Tariff)?

16 of its 85 interconnected installs (18.8% of the 85 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 31.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.