MMW BUILDERS

How many solar installs has MMW BUILDERS done in California, and which license number is on its installs?

MMW BUILDERS has 37 residential solar installs interconnected in California, active in the records from 2021 through 2026 (Dec 6, 2021 to Feb 5, 2026), most of them in Sonoma County (29), Contra Costa County (4) and Alameda County (2). CSLB lists license 1074995 (MMW BUILDERS) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-23, C-43, expires Apr 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
37
Last 24 months
1
Total capacity
227.5 kW DC
Median system size
6 kW DC
With battery storage
10.8% all time; 0.0% last 24 months
Third-party owned
0.0% of 37 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Dec 6, 2021
Latest install
Feb 5, 2026
Counties
4
Utilities
PGE 37
CSLB license
1074995

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
202150
2022260
202354
202400
202500
2026 (through Aug 31, 2026)10

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 37 interconnected installs with a tariff recorded (37) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.037100.0%4 (10.8%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on MMW BUILDERS’s installs. No residential system in the file lists a third-party owner name that matches MMW BUILDERS exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 1 of MMW BUILDERS’ 1 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used modules recorded as Qcells.

In the last 24 months, 1 of MMW BUILDERS’ 1 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1, 100.0%) used inverters recorded as Enphase.

In the last 24 months, none of MMW BUILDERS’ 1 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

4 of 4 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells129
Inverter makerEnphase113
Battery makerEnphase04

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 37 of 37 installs, inverters on 37. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1074995MMW BUILDERS (Corporation)CLEARB General Building Contractor; C-23; C-43Apr 21, 2021Apr 30, 202737

License numbers are the ones the utilities recorded on the interconnection applications (37 of 37 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1074995. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Sonoma29
Contra Costa4
Alameda2
Marin2

Top cities

CityInstalls
Santa Rosa13
Rohnert Park11
Petaluma4
Orinda3
Oakland2
El Cerrito1
Healdsburg1
Novato1
San Rafael1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
MMW BUILDERS37

Common questions

Where does MMW BUILDERS install solar?

Its installs are spread across 4 counties. The most are in Sonoma County (29 installs), followed by Contra Costa County (4).

How often does MMW BUILDERS install batteries with solar?

10.8% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 1).

How many MMW BUILDERS installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 37 interconnected installs with a tariff recorded (37) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.