Excel Electric Inc

How many solar installs has Excel Electric Inc done in California, and which license number is on its installs?

Excel Electric Inc has 39 residential solar installs interconnected in California, active in the records from 2010 through 2026 (Apr 26, 2010 to Mar 22, 2026), most of them in Amador County (31), Calaveras County (6) and Los Angeles County (1). CSLB lists license 791536 (EXCEL ELECTRIC INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Feb 28, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
39
Last 24 months
5
Total capacity
274.2 kW DC
Median system size
7.3 kW DC
With battery storage
2.6% all time; 20.0% last 24 months
Third-party owned
0.0% of 38 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
3 installs, latest Mar 22, 2026
Ownership types recorded
none recorded
First install
Apr 26, 2010
Latest install
Mar 22, 2026
Counties
4
Utilities
PGE 38, SCE 1
CSLB license
791536

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
201020
201110
201230
201320
201410
201520
201630
201730
201800
201910
202030
202100
202230
2023100
202400
202541
2026 (through Aug 31, 2026)10

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

3 of its 39 interconnected installs (7.7% of the 39 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 33.3% of those include battery storage. The latest Net Billing Tariff install was approved Mar 22, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.01435.9%not counted
NEM 2.02256.4%0 (0.0%)
Net Billing Tariff37.7%1 (33.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Excel Electric Inc’s installs. No residential system in the file lists a third-party owner name that matches Excel Electric Inc exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 5 of Excel Electric Inc’s 5 installs name a module maker in the “Generator Manufacturer” fields, and most of those (4, 80.0%) used modules recorded as Qcells.

In the last 24 months, 5 of Excel Electric Inc’s 5 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (5, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 1 of Excel Electric Inc’s 5 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as Enphase.

1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells418
REC1not in top list
Inverter makerEnphase517
Battery makerEnphase11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 37 of 39 installs, inverters on 39. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
791536EXCEL ELECTRIC INC (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorFeb 20, 2001Feb 28, 202731

License numbers are the ones the utilities recorded on the interconnection applications (31 of 39 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 791536. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Amador31
Calaveras6
Los Angeles1
San Joaquin1

Top cities

CityInstalls
Jackson17
Sutter Creek6
Ione5
Mokelumne Hill4
Fiddletown1
La Canada Flintridge1
Lodi1
Pine Grove1
Plymouth1
Valley Springs1
Wallace1

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
EXCEL ELECTRIC INC20
Excel Electric Inc18
Excel Electric Inc.1

Common questions

Where does Excel Electric Inc install solar?

Its installs are spread across 4 counties. The most are in Amador County (31 installs), followed by Calaveras County (6).

How often does Excel Electric Inc install batteries with solar?

2.6% of its interconnected solar installs include battery storage across all years, and 20.0% in the last 24 months (1 of 5).

How many Excel Electric Inc installs are under NEM 3.0 (the Net Billing Tariff)?

3 of its 39 interconnected installs (7.7% of the 39 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 33.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.