How many solar installs has EMERALD ECO done in California, and which license number is on its installs?
EMERALD ECO has 44 residential solar installs interconnected in California, active in the records from 2019 through 2025 (Nov 25, 2019 to May 8, 2025), most of them in San Mateo County (32), Santa Clara County (6) and Marin County (2). The license number recorded on most of its installs, 973399, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 44
- Last 24 months
- 10
- Total capacity
- 433.9 kW DC
- Median system size
- 9.3 kW DC
- With battery storage
- 22.7% all time; 90.0% last 24 months
- Third-party owned
- 0.0% of 44 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 10 installs, latest Apr 10, 2025
- Ownership types recorded
- none recorded
- Median battery size
- 1 kWh (3 installs list a capacity)
- First install
- Nov 25, 2019
- Latest install
- May 8, 2025
- Counties
- 7
- Utilities
- PGE 44
- CSLB license
- 973399
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2019 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2019 | 1 | 0 |
| 2020 | 4 | 0 |
| 2021 | 3 | 0 |
| 2022 | 8 | 0 |
| 2023 | 14 | 0 |
| 2024 | 8 | 5 |
| 2025 | 6 | 5 |
| 2026 (through Aug 31, 2026) | 0 | 0 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
10 of its 44 interconnected installs (22.7% of the 44 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.0% of those include battery storage. The latest Net Billing Tariff install was approved Apr 10, 2025.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 0 | 0.0% | not counted |
| NEM 2.0 | 34 | 77.3% | 1 (2.9%) |
| Net Billing Tariff | 10 | 22.7% | 9 (90.0%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
The utilities recorded no third-party ownership type (PPA or lease) on EMERALD ECO’s installs. No residential system in the file lists a third-party owner name that matches EMERALD ECO exactly.
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 10 of EMERALD ECO’s 10 installs name a module maker in the “Generator Manufacturer” fields, and most of those (10, 100.0%) used modules recorded as REC.
In the last 24 months, 10 of EMERALD ECO’s 10 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (6, 60.0%) used inverters recorded as Enphase.
In the last 24 months, 8 of EMERALD ECO’s 10 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (5, 62.5%) used batteries recorded as Enphase.
9 of 10 battery-paired PG&E and SCE installs (90.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | REC | 10 | 42 |
| Inverter maker | Enphase | 6 | 36 |
| Tesla | 4 | 4 | |
| Battery maker | Enphase | 5 | 6 |
| Tesla | 3 | 3 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 43 of 44 installs, inverters on 44. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 973399 | Not found in the CSLB License Master file pulled Nov 4, 2026 | 44 | ||||
License numbers are the ones the utilities recorded on the interconnection applications (44 of 44 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
Local solar permits naming its license
Solar permits in city and county open data that list EMERALD ECO’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.
| Permit data | License | 2022 | Total |
|---|---|---|---|
| City and County of San Francisco | 973399 | 1 | 1 |
Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.
Counties
| County | Installs |
|---|---|
| San Mateo | 32 |
| Santa Clara | 6 |
| Marin | 2 |
| Alameda | 1 |
| Lake | 1 |
| San Benito | 1 |
| San Francisco | 1 |
Top cities
| City | Installs |
|---|---|
| Redwood City | 9 |
| San Carlos | 5 |
| San Mateo | 4 |
| Belmont | 3 |
| Menlo Park | 3 |
| Portola Valley | 3 |
| Los Altos Hills | 2 |
| San Jose | 2 |
| South San Francisco | 2 |
| Berkeley | 1 |
| Burlingame | 1 |
| Cobb | 1 |
| Emerald Hills | 1 |
| Hollister | 1 |
| Larkspur | 1 |
Names as recorded by the utilities
The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| EMERALD ECO | 44 |
Common questions
Where does EMERALD ECO install solar?
Its installs are spread across 7 counties. The most are in San Mateo County (32 installs), followed by Santa Clara County (6).
How often does EMERALD ECO install batteries with solar?
22.7% of its interconnected solar installs include battery storage across all years, and 90.0% in the last 24 months (9 of 10).
How many EMERALD ECO installs are under NEM 3.0 (the Net Billing Tariff)?
10 of its 44 interconnected installs (22.7% of the 44 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.