Dority Roofing Inc.
How many solar installs has Dority Roofing Inc. done in California, and which license number is on its installs?
Dority Roofing Inc. has 72 residential solar installs interconnected in California, active in the records from 2011 through 2026 (Mar 29, 2011 to Jul 8, 2026), most of them in Monterey County (71) and San Mateo County (1). CSLB lists license 728609 (DORITY ROOFING INCORPORATED) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-39, expires Oct 31, 2028.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 72
- Last 24 months
- 15
- Total capacity
- 448 kW DC
- Median system size
- 5 kW DC
- With battery storage
- 0.0% all time; 0.0% last 24 months
- Third-party owned
- 0.0% of 72 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 13 installs, latest Jul 8, 2026
- Ownership types recorded
- none recorded
- First install
- Mar 29, 2011
- Latest install
- Jul 8, 2026
- Counties
- 2
- Utilities
- PGE 72
- CSLB license
- 728609
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2011 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2011 | 3 | 0 |
| 2012 | 0 | 0 |
| 2013 | 3 | 0 |
| 2014 | 9 | 0 |
| 2015 | 14 | 0 |
| 2016 | 5 | 0 |
| 2017 | 4 | 0 |
| 2018 | 2 | 0 |
| 2019 | 3 | 0 |
| 2020 | 1 | 0 |
| 2021 | 1 | 0 |
| 2022 | 1 | 0 |
| 2023 | 9 | 0 |
| 2024 | 3 | 0 |
| 2025 | 12 | 0 |
| 2026 (through Aug 31, 2026) | 2 | 0 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
13 of its 72 interconnected installs (18.1% of the 72 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Jul 8, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 34 | 47.2% | not counted |
| NEM 2.0 | 25 | 34.7% | 0 (0.0%) |
| Net Billing Tariff | 13 | 18.1% | 0 (0.0%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
The utilities recorded no third-party ownership type (PPA or lease) on Dority Roofing Inc.’s installs. No residential system in the file lists a third-party owner name that matches Dority Roofing Inc. exactly.
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 15 of Dority Roofing Inc.’s 15 installs name a module maker in the “Generator Manufacturer” fields, and most of those (15, 100.0%) used modules recorded as SunPower.
In the last 24 months, 15 of Dority Roofing Inc.’s 15 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (11, 73.3%) used inverters recorded as SunPower.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | SunPower | 15 | 58 |
| Inverter maker | SunPower | 11 | 45 |
| Enphase | 4 | 8 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 70 of 72 installs, inverters on 72. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 728609 | DORITY ROOFING INCORPORATED (Corporation) | CLEAR | B General Building Contractor; C-39 Roofing Contractor | Oct 15, 1996 | Oct 31, 2028 | 64 |
License numbers are the ones the utilities recorded on the interconnection applications (64 of 72 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 728609. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Counties
Top cities
| City | Installs |
|---|---|
| Carmel | 31 |
| Monterey | 17 |
| Pebble Beach | 8 |
| Carmel Valley | 6 |
| Pacific Grove | 6 |
| Salinas | 2 |
| Marina | 1 |
| Woodside | 1 |
Names as recorded by the utilities
The utilities recorded this installer under 9 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| DORITY ROOFING INCORPORATED | 30 |
| Dority Roofing Inc. | 9 |
| Dority Roofing Inc | 8 |
| DORITY ROOFING INC | 8 |
| DORITY ROOFING INC. | 8 |
| Dority Roofing | 5 |
| Dority Roofing Incorporated | 2 |
| DORITY ROOFING | 1 |
| Dority Roofing, Inc. | 1 |
Common questions
Where does Dority Roofing Inc. install solar?
Its installs are spread across 2 counties. The most are in Monterey County (71 installs), followed by San Mateo County (1).
How often does Dority Roofing Inc. install batteries with solar?
0.0% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 15).
How many Dority Roofing Inc. installs are under NEM 3.0 (the Net Billing Tariff)?
13 of its 72 interconnected installs (18.1% of the 72 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.