How many solar installs has COMPLETE CONSTRUCTION done in California, and which license number is on its installs?

COMPLETE CONSTRUCTION has 122 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Mar 27, 2019 to Apr 13, 2026), most of them in Kern County (120), Fresno County (1) and Madera County (1). The license number recorded on most of its installs, 874654, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
122
Last 24 months
39
Total capacity
717.8 kW DC
Median system size
3.5 kW DC
With battery storage
0.0% all time; 0.0% last 24 months
Third-party owned
48.4% of 122 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
other 59
First install
Mar 27, 2019
Latest install
Apr 13, 2026
Counties
3
Utilities
PGE 121, SCE 1
CSLB license
874654

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
201970
2020100
202160
2022170
2023170
2024550
202570
2026 (through Aug 31, 2026)30

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 122 interconnected installs with a tariff recorded (122) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.0122100.0%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 59 of COMPLETE CONSTRUCTION’s installs the utility recorded a third-party ownership type: PPA 0, lease 0, prepaid lease 0, other 59. No residential system in the file lists a third-party owner name that matches COMPLETE CONSTRUCTION exactly.

Third-party owner named on its installsInstalls
Golden Empire Affordable Housing21
Kern Housing Authority14
GE Affordable Housing/Kern Housing Auth.7
GEAH/Kern HA4
GEAH/Kern Housing3

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 39 of COMPLETE CONSTRUCTION’s 39 installs name a module maker in the “Generator Manufacturer” fields, and most of those (26, 66.7%) used modules recorded as United Renewable Energy.

In the last 24 months, 39 of COMPLETE CONSTRUCTION’s 39 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (33, 84.6%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerUnited Renewable Energy2640
Qcells1235
LG135
Inverter makerEnphase3368
SolarEdge657

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 115 of 122 installs, inverters on 122. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
874654Not found in the CSLB License Master file pulled Nov 4, 2026122

License numbers are the ones the utilities recorded on the interconnection applications (122 of 122 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Kern120
Fresno1
Madera1

Top cities

CityInstalls
Bakersfield111
Shafter5
Wasco2
Clovis1
Lamont1
Madera1
Tehachapi1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
COMPLETE CONSTRUCTION117
Complete Construction5

Common questions

Where does COMPLETE CONSTRUCTION install solar?

Its installs are spread across 3 counties. The most are in Kern County (120 installs), followed by Fresno County (1).

How often does COMPLETE CONSTRUCTION install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 39).

How many COMPLETE CONSTRUCTION installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 122 interconnected installs with a tariff recorded (122) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.